
B-BOX 12.8 installation guidance
17
/
30
a)
Connect the negative cable (Black cable from cabinet) to the “
P-
“ of battery, refer to step 1~4 in figure
Tools: Cross screwdriver, Fixed torque: 20±2kgf.cm
b)
Connect the positive cable (Red cable from cabinet) to the “
P+
“of battery, refer to step 5 in figure
Tools: Cross screwdriver, Fixed torque: 20±2kgf.cm
c) Sampling cable connection
Connect the sampling cable terminal of battery and BMS which marked in figure 8 :
Mark: Check the sampling terminal are firm installed.
1
2
3
4
5
6~9
10
Figure 7 Cable connection order