87
USING AND DRIVING
05
• Single-phase AC charging pile
• Use AC charging piles in public places
to charge the vehicle.
• Charging time: refer to the message on
the instrument cluster or infotainment
system.
2. Charging operation
2. Charging operation
• Unlock the vehicle and open the charge
port cover:
• Open as per the instructions for
household portable AC charging
equipment.
• Connect to vehicle port:
• Plug the equipment's charging coupler
into the port and lock it.
• Setting:
• For AC charging pile/box subject to
authentication, swipe the card or
scan the QR code. For details, see the
instruction manual for charging pile/
box.
• The connection indicator
on the
instrument cluster lights up.
• During the charging process, the
instrument cluster displays relevant
charging parameters and the charging
sign.
• At this time, scheduled charging
can be set through the infotainment
system.
3. Stopping charging
3. Stopping charging
• Stopping charging:
• Charging stops automatically when
the battery is fully charged, or when it
is interrupted by the user.
• Disconnecting charging coupler:
• Disconnect the coupler by following
the instructions of the household
portable AC charging equipment.
• Close the AC charge port cover (see the
portable AC charging process).
• Store the equipment properly.
• After the AC charging pile/box is
used, place the coupler back in its
designated position.
Charging Station DC Charging
1. Equipment description
1. Equipment description
• Use the DC battery charger in public
places to charge the vehicle. Generally, it
is installed in a specific charging station.
• Equipment specification: see the
description of battery charger.
• Charging time: refer to the message on
the instrument cluster or infotainment
system.
2. Charging operation
2. Charging operation
• Open the port hatch and remove its
cover.
• Plug the coupler into the port, making
sure it is tight.
• Operate the charging equipment to start
charging.
• The connection indicator
on the
instrument cluster lights up.
• During the charging process, the
instrument cluster or infotainment
system displays relevant charging
parameters and the charging sign.
Summary of Contents for ATTO 3 2022
Page 1: ...O W N E R S M A N U A L bydauto co nz ...
Page 5: ...4 ...
Page 9: ...8 ...
Page 10: ...ILLUSTRATION INDEX 01 Exterior 10 Dashboard Panel 11 Center Console 12 Door 13 ...
Page 15: ...14 ...
Page 36: ...DASHBOARD 03 Instrument cluster 36 ...
Page 47: ...46 ...
Page 48: ...CONTROLLER OPERATIONS 04 Car Doors and Keys 48 Seats 59 Steering Wheel 62 Switches 65 ...
Page 137: ...136 ...
Page 154: ...07 MAINTENANCE Maintenance Information 154 Regular Maintenance 159 Self Maintenance 163 ...
Page 181: ...180 ...
Page 182: ...WHEN FAULTS OCCUR 08 When Faults Occur 182 ...
Page 190: ...VEHICLE SPECIFICATIONS 09 Data Information 188 Tips 192 ...