![BWT PRO A Manual Download Page 39](http://html1.mh-extra.com/html/bwt/pro-a/pro-a_manual_2836827039.webp)
2021/03 - Indice de révision : B Code : 29740
TRAITEMENT DE L'EAU
39/88
Aperture for
fastening the eye
to the wall
Aperture for
fastening the eye
to the panel
Hold the template against the wall at the selected installation site, and drill in the 4 locations indicated by
the template using a 5 mm diameter drill bit. Push the bushings into the holes and screw a round head
screw into each bushing leaving it to protrude slightly. Hang the panel on the round head screws using the
suspension eye holes.
!
Do not obstruct the flow of air behind the panel that allows cooling.
!
Do not install the control panel in a cupboard or other location with inadequate ventilation, this could
lead to overheating of the control panel and a risk of fire.
4.3
Electrical wiring
Wire the control panel in as follows;
Connect the cell and the gas sensor to the control panel. NEVER MODIFY OR EXTEND THE CABLES;
BWT
Summary of Contents for PRO A
Page 56: ...2021 03 Indice de r vision B Code 29740 TRAITEMENT DE L EAU 56 88...
Page 86: ...Notes 2021 03 Indice de r vision B Code 29740 TRAITEMENT DE L EAU 86 88...
Page 87: ...Notes 2021 03 Indice de r vision B Code 29740 TRAITEMENT DE L EAU 87 88...
Page 88: ...2021 03 Indice de r vision B Code 29740 TRAITEMENT DE L EAU 88 88...