background image

UK

 

30 

 

 

Option 7 - Conductivity Meter including a 4-20 mA output  

13.8.7

Part No.: 451202013  
       and  452536010 

 

BWT PERMAQ® Pro 2000 units may be equipped with 
a conductivity meter for metering and signal output. 
The conductivity meter activates two solenoid valves, if 
the water quality is >20 µS/cm so that the ”bad” water 
is led to drain (quality flush). 
 

 

Option 8 - Storage Tank  

13.8.8

Part No.: ** 

 

200-2,000  litre  AQUA  FLEX  reservoir  with  integrated 
transport  pump  and  pressure  switch  used  for  control-

ling start and stop of the BWT PERMAQ

®

 Pro 2000. 

 

Option 9 - Mixed-bed 

13.8.9

Part No.: **  

 

If a water quality < 0,5 µS/cm is required, we recom-
mend  a  BWT  HOH  Demi  Mix  (a  mixed-bed  unit)  for 
post-treatment of the reverse osmosis water.  

 

 

Option 10 - Upgrade Kit 

13.8.10

Part No.: **  

 

If  a  larger  permeate  capacity  is  required,  we  recom-
mend  installing  an  extra  membrane  which  is  included 

in the upgrade kit for BWT PERMAQ

®

 Pro 2000.  

 

Option 11 - Tool/Spare Part Box 

13.8.11

Part No.: 451409000 

 

The  tool/spare  part  box  contains  the  most  commonly 
needed small parts and tools to be used when servicing 

the  BWT  PERMAQ

®

  Pro  2000,  e.g.  when  replacing 

membranes.  

 
 
 
 

Summary of Contents for PERMAQ PRO 2000

Page 1: ...BWT PERMAQ PRO 2000 Reverse Osmosis Plant www bwt group com Installation and Operating Manual UK...

Page 2: ...UK 2...

Page 3: ...y of Alarm Conditions 13 9 2 11 Settings 14 10 TECHNICAL SPECIFICATION 15 10 1 Technical specifications 15 10 2 Technical data 16 11 FUNCTIONAL DESCRIPTION 17 12 REPLACEMENT OF MEMBRANES 17 13 ANNEX 1...

Page 4: ...ore installing and starting up the plant Correct installation and operation will also form the basis of a factory warranty The BWT PERMAQ Pro 2000 plant with its compact and fin ished design is easy t...

Page 5: ...close proximity of the plant placed in such a way that the overflowing water does not cause any damage If there is no floor drain which has been dimensioned to the full capacity of the RO unit near t...

Page 6: ...e is then a risk it will get sucked back into the plant in case of a stoppage Important It should never be possible for the outlet hose to become bent or in any other way clogged as it would dam age t...

Page 7: ...mpera ture is 8 C for an BWT PERMAQ Pro 2030 it means that the permeate capacity will be 6 below the normal 1700 l h i e 1598 l h When the requested pressure and permeate capacities have been obtained...

Page 8: ...is operating Then adjust valve V3 so that the concentrate flow becomes 20 30 again see chapters 7 1 and 7 2 Biannually Check of pump Follow the manufacturer s instructions Check pipelines and con nect...

Page 9: ...UK 9 9 2 Troubleshooting This section deals with the problems that may arise on the plant The plant capacity has dropped 9 2 1...

Page 10: ...UK 10 The quality of the treated water is higher than 20 S cm 9 2 2 Alarm Low feed water pressure 9 2 3...

Page 11: ...UK 11 Alarm Transport pump 9 2 4 Indication Level low 9 2 5...

Page 12: ...e plant is not operating 9 2 7 Alarm The transport pump stops and starts 9 2 8 Check AQUA Flex s manual chapter 6 Troubleshooting Hard water is measured at the soft water tap 9 2 9 Check softening pla...

Page 13: ...2 4 ALARM Too low feed water pressure Nothing is working permanent condition Section 9 2 3 Too low feed water pressure HP pump stopped TP pump is working Automatic restart 3 times if feed water pressu...

Page 14: ...a start up delay of the pump Use of DIP switch No 1 High pressure pump No 2 Transport pump No 3 Selection of BWT PERMAQ Pro 2000 model No 4 6 Transport pump Factory settings ON OFF switch F2 Fuse Hig...

Page 15: ...0 Bar V1 Ball valve control Brass V2 Needle valve recirculation Brass V3 Needle valve concentrate Brass V4 Ball valve check valve PVC V5 option Needle valve mixing Brass V7 option Ball valve CIP Brass...

Page 16: ...tivity S cm 20 Weight full kg 129 163 176 186 214 229 Power connection V Hz 400 50 Power consumption kW m 3 4 1 8 1 8 1 3 1 2 1 1 Pipe inlet inch Concentrate outlet mm 14 Permeate outlet mm 1 Width De...

Page 17: ...the outside of the membrane is placed When the new mem brane is to be fitted this V cup seal must be fitted at the same end of the membrane as the former one i e if the V cup seal is located at the t...

Page 18: ...X 13 1 P I Diagram 13 2 Layout drawings 13 3 Wiring diagram 13 4 Start up test 13 5 Operating journal 13 6 Spare parts list BWT PERMAQ Pro 2000 13 7 Spare parts drawing 13 8 Options 13 9 Declaration o...

Page 19: ...UK 19 13 1 P I Diagram...

Page 20: ...UK 20 13 2 Layout Drawings...

Page 21: ...UK 21 13 3 Wiring Diagram...

Page 22: ...UK 22...

Page 23: ...UK 23...

Page 24: ...UK 24...

Page 25: ...of technician Date Time consumption for the start up hours Start up test The start up test sheet must be completed and filed together with the operating journal Test of raw water YES Time controlled...

Page 26: ...BWT PERMAQ Pro 2010 2080 Every 6 month Control of feed water Pressure switch PS1 Check up for leaks and RO plants functionality Each month Flushing of the membranes Open V3 Daily Hardness dH V4 Feed w...

Page 27: ...mplete 12 V4 Test valve water hardness test 200721020 13 Quick fitting 14 mm elbow 1 454090014 3 years 14 Quick fitting 14 mm x Base 454065014 3 years 15 V7 Ball valve Membrane pressure vessel 16 Pres...

Page 28: ...UK 28 13 7 Spare Parts Drawing...

Page 29: ...f the softening unit in case of lacking water pressure Option 4 Carbon Filter Filter 13 8 4 Part No In order to reduce the content of free chlorine pesti cides and organic solvents you may install a c...

Page 30: ...ssure switch used for control ling start and stop of the BWT PERMAQ Pro 2000 Option 9 Mixed bed 13 8 9 Part No If a water quality 0 5 S cm is required we recom mend a BWT HOH Demi Mix a mixed bed unit...

Page 31: ...8 14 Part No 451405112 for Pro 2010 2040 Part No 451405114 for Pro 2060 2080 The quality flush system monitors that the RO plant produces permeate 20 S If the limit value is exceed ed the poor permeat...

Page 32: ...tle once more until Flow starts flashing again Now turn the stroke length of the pump back approx 20 scale parts note the old value Flow should stop flashing If not you must turn again the dial of the...

Page 33: ...t bwt dk www bwt dk Herewith declares that BWT PERMAQ Pro 2010 2020 2030 2040 2060 and 2080 is in conformity with the provisions of the Machinery Directive Directive 2006 42 EC is in conformity with t...

Page 34: ..._________________________________________________________________ ________________________________________________________________________________ _____________________________________________________...

Page 35: ..._________________________________________________________________ ________________________________________________________________________________ _____________________________________________________...

Page 36: ...33 1 4922 45 00 Fax 33 1 4922 45 45 E Mail bwt bwt fr BWT Belgium NM Leuvensesteenweg 633 B 1930 Zaventem Tel 32 2 758 03 10 Fax 32 2 758 03 33 E Mail bwt bwt be BWE esk Republika s r o Lipovo 196 Ces...