BWT PERMAQ COMPACT 111 Installation And Operating Manual Download Page 1

UK

 

 

 

 

 

 
 
 

 
 

 
 
 
 
 
 
 
 
 
 

 

 

 
 

                                         

 

 

 

 

 

 

 
 
 
 
 

 
 

 

 
 

 

 

 

BWT PERMAQ

®

 

COMPACT 111-116 

Reverse Osmosis Plant 

 
 

 

 

 

 

Installation and Operating manual                        

UK

 

               For You and Planet Blue. 

Summary of Contents for PERMAQ COMPACT 111

Page 1: ...UK BWT PERMAQ COMPACT 111 116 Reverse Osmosis Plant Installation and Operating manual UK For You and Planet Blue...

Page 2: ...UK 2...

Page 3: ...y of the treated water is higher than 20 S cm 9 9 2 3 Alarm Low raw water pressure 10 9 2 4 Alarm Transport pump 10 9 2 5 Indication Level low 11 9 2 6 Alarm Level high 11 9 2 7 The plant is not opera...

Page 4: ...mbled and tested in our factory Your BWT PERMAQ Compact plant is equipped with casters and constructed in a stainless steel frame That means that the plant can be placed e g underneath a table and the...

Page 5: ...a raw water pres sure of minimum 2 bar and maxi mum 7 bar The quality of the treated water will be less than 20 S cm at 10 C 5 WATER CONNECTIONS Note All water connections must be in compliance with l...

Page 6: ...ur plant depends on the raw water quality A too high water re covery will damage the plant membranes On condition that the raw water complies with the quality requirements the plant can oper ate with...

Page 7: ...ps the plant when the reservoir tank is full NB Do not touch the level switch Create a large consumption of treated water to get the air out of the pump Check that the transport pump G Figure 3 starts...

Page 8: ...he BWT PERMAQ Compact plant is produced and designed for a minimum of servicing and maintenance How ever there are certain functions which should be checked regularly Maintenance intervals should be p...

Page 9: ...UK 9 9 2 Trouble shooting This section deals with the problems that may arise on the plant 9 2 1 The plant capacity has dropped 9 2 2 The quality of the treated water is higher than 20 S cm...

Page 10: ...UK 10 9 2 3 Alarm Low raw water pressure 9 2 4 Alarm Transport pump...

Page 11: ...UK 11 9 2 5 Indication Level low 9 2 6 Alarm Level high...

Page 12: ...UK 12 9 2 7 The plant is not operating...

Page 13: ...UK 13 9 2 8 Alarm The transport pump stops and starts 9 2 9 Hard water is measured at the soft water tap...

Page 14: ...condition Section 9 2 4 ALARM Too low raw water pressure Nothing is working permanent condition Section 9 2 3 Too low raw water pressure HP pump stopped TP pump is working Automatic restart 3 times i...

Page 15: ...ansport pump 10 TECHNICAL SPECIFICATION 10 1 Technical specifications BWT PERMAQ Compact 111 116 Tag number Designation Type data P1 High pressure pump 14 bar 1x230V 0 64kW P2 Transport pump 1x230V 0...

Page 16: ...ption kW 1 5 1 5 1 5 1 5 1 5 1 5 Electrical frequency Hz 50 50 50 50 50 50 Pipe inlet Diameter Concentrate outlet Diameter 10mm Hose 10mm Hose 10mm Hose 10mm Hose 10mm Hose 10mm Hose Permeate outlet D...

Page 17: ...he plant components membranes pump are heated up to ap prox 40 C Replace the water in the bucket continuously in or der to keep the water at 40 C during the heating period When the plant components ar...

Page 18: ...is fitted inside the membrane pipe When the membrane has been replaced and the end plate has been refitted with the U lock in serted remount all hoses Note When the hose must be pressed hard in to pus...

Page 19: ...NNEX 13 1 P I diagram 13 2 Layout drawings 13 3 Wiring diagrams 13 4 Start up test 13 5 Operating journal 13 6 Spare parts list BWT PERMAQ Compact 111 116 13 7 Spare parts drawing 13 8 Declaration of...

Page 20: ...UK 20 13 1 P I Diagram...

Page 21: ...UK 21 13 2 Layout Drawings...

Page 22: ...UK 22...

Page 23: ...UK 23...

Page 24: ...UK 24...

Page 25: ...UK 25 13 3 Wiring Diagrams...

Page 26: ...UK 26...

Page 27: ...UK 27...

Page 28: ...of technician Date Time consumption for the start up hours Start up test The start up test sheet must be completed and filed together with the operating journal Test of raw water YES Time controlled...

Page 29: ...List BWT PERMAQ Compact 111 116 Control of rawwater Pressure switch PS1 every 6 month Check up for leaks every month Softening plant option Hardness dH Raw water Raw water tempera ture C Raw water pre...

Page 30: ...404680 12 Concentration valve 1 451404681 13 Push in fitting 10 mm elbow 1 454090010 3 years 13A Push in fitting 12 mm elbow 1 454090012 3 years 14 Push in fitting 10 mm T piece 1 454095010 3 years 15...

Page 31: ...ing 10x base 1 454065010 3 years 36A Push in fitting 12x base 1 454065012 3 years 37 End plate 2 451202117 3 5 years Miscellaneous 10 mm plastic hose 1 m 454001010 3 years 12 mm plastic hose 20 F capa...

Page 32: ...UK 32 13 7 Spare Parts Drawing...

Page 33: ...t bwt dk www bwt dk herewith declares that BWT PERMAQ Compact 111 112 113 114 115 116 is in conformity with the provisions of the Machinery Directive directive 2006 42 EC is in conformity with the pro...

Page 34: ...________________________ ________________________________________________________________________________ ________________________________________________________________________________ _____________...

Page 35: ...________________________ ________________________________________________________________________________ ________________________________________________________________________________ _____________...

Page 36: ...00 Fax 33 1 4922 45 45 E Mail bwt bwt fr BWT Belgium NM Leuvensesteenweg 633 B 1930 Zaventem Tel 32 2 758 03 10 Fax 32 2 758 03 33 E Mail bwt bwt be BWE esk Republika s r o Lipovo 196 Cestlice CZ 251...