18
inside the cell and runs into the Neuthox tank. When the level sensor in the tank detects a high level of Neuthox,
the machine will produce an extra 15 litres above the high level. When the tank is full or another process must
start, the production will stop. The salt will be rinsed out of the cell. The machine will be on standby mode until the
level sensor in the tank detects a low level again.
The machine starts a regeneration of the water softener unit when the capacity during Neuthox production
has reached 100%. During any other process such as filling the brine tank and standby mode the
regeneration will start at 80% capacity. During the regeneration process the brine pump pumps brine
through the softener. This changes the captured calcium ions, afterwards the brine is rinsed out of the
softener.
The brine tank will be filled during Neuthox production when the level sensor has detected a low level and
the calculated consumption has reached the minimum brine level in the tank. During any other process
such as regeneration or standby mode, the filling of the brine tank will start when the level sensor detects a
low level.
Neuthox dosing for Proportional dosing
Neuthox dosing for Proportional dosing is used in drinking water for human and livestock consumption. Start the
Neuthox dosing on the Screen for Neuthox. The setpoint for the mixing ratio of Neuthox in the water is set at
4ppm or the permitted level according to local legislation. Number of pulses from the water meter and the
amount of water per pulse determines the speed of the dosing pump. The water meter informs the machine of the
water consumption in the system and ensures that the amount of Neuthox dosed into the system will match the
desired amount.
When the machine has been running, the amount of free chlorine in the system is measured with a water
testing instrument, and the setpoint is adjusted to the permitted level according to the local legislation.
Summary of Contents for Disinfecton
Page 8: ...8 Type Key...
Page 9: ...9 Product overview Electrical cabinet Hydraulic cabinet...
Page 27: ...27 Spare part drawings...
Page 28: ...28 PI diagram...
Page 29: ...29 Arrangement drawing...
Page 32: ...32 Declaration of Conformity...