7. PRE-OPERATION INSPECTION AND SERVICE
Before each use, a pre-operation inspection and service of the implement and power unit must be performed.
This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped
and functional, and performing needed repairs. Do not operate the implement and power unit it the pre-
operation inspection reveals any condition affecting safe operation. Perform repairs and replacement of
damaged and missing parts as soon as noticed. By performing a thorough pre-operation inspection and
service, valuable down time and repair cost can be avoided.
OPS-UPI-0008
Periodically inspect all moving parts for wear and replace when
necessary with authorized service parts. Look for loose fasteners, worn
or broken parts, and leaky or loose fittings. Make sure all pins have
cotter pins and washers. Serious injury may occur from not maintaining
this machine in good working order.
(SG-21)
7.1 Tractor Pre-Operation Inspection/Service
Refer to the tractor operator’s manual to ensure a
complete pre-operation inspection and scheduled
service is performed according to the
manufacturers recommendations. The following
are some of the items that require daily service and
inspection:
•
Tire condition/air pressure
•
Wheel lug bolts
•
Steering linkage
•
PTO shield
•
SMV sign is clean and visible
•
Tractor’s lights are clean and functional
•
Tractor Seat belt is in good condition
•
Tractor ROPS is in good condition
•
ROPS is in the raised position
•
No tractor oil leaks
•
Radiator free of debris
•
Engine oil level and condition
•
Engine coolant level and condition
•
Power brake fluid level
•
Power steering fluid level
•
Fuel condition and level
•
Sufficient lubrication at all lube points
•
Air filter condition
OPS-U-0030
Summary of Contents for 3PBS1
Page 4: ...Safety Section 1 1 SAFETY SECTION...
Page 14: ...SAFETY 3PBS1 3PBS2 10 20 Safety Section 1 11 2020Alamo Group Inc...
Page 15: ......
Page 16: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 20: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 22: ...Operation Section 4 1 OPERATION SECTION...
Page 41: ......
Page 42: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 44: ......
Page 46: ...3PBS1 3PBS2 SOM 10 20 P N 50073292 Printed U S A 3PBS1 3PBS2 BALE SPEAR...