6 | Commissioning
14 / 28
Instruction Manual R5 RA 0155 A_EN_en
5.6.3 Wiring Diagram Resistance Thermometer (Optional)
Part no.:
0651 563 753
Connector:
M12x1, 4-pin
Electrical data:
U = 10 … 35 VDC
4 ... 20 mA
►
0 ... 150 °C
Warning / trip signals:
.
1
2
4
3
3
1
+
-
1 = Brown ; 3 = Blue
6
Commissioning
NOTICE
The machine can be shipped without oil.
Operation without oil will ruin the machine in short time!
• Prior to commissioning, the machine must be filled with oil, see
.
CAUTION
During operation the surface of the machine may reach temperatures of more than
70°C.
Risk of burns!
• Avoid contact with the machine during and directly after operation.
CAUTION
Noise of running machine.
Risk of damage to hearing!
If persons are present in the vicinity of a non noise insulated machine over extended pe-
riods:
• Make sure that ear protection is being used.
• Make sure that the installation conditions (see
) are met.
• Switch on the machine.
• Make sure that the maximum permissible number of starts does not exceed 12 starts
per hour. Those starts should be spread within the hour.
• Make sure that the operating conditions comply with the
.
• After a few minutes of operation, check the oil level and top up if necessary.
As soon as the machine is operated under normal operating conditions:
• Measure the motor current and record it as reference for future maintenance and
troubleshooting work.
6.1 Conveying Condensable Vapours
Water vapour within the gas flow is tolerated within certain limits. The conveyance of
other vapours shall be agreed upon with Busch.
If condensable vapours are to be conveyed:
Summary of Contents for R5 RA 0155 A
Page 26: ...Note ...
Page 27: ...Note ...