PART 3-INSTALLATION AND MAINTENANCE
3.3.2
All pieces should be carefully inspected for shipping damage, loose parts,
and, most importantly, exposed uninsulated electrical parts. Contact Burny
immediately if any problems occur.
3.3.3
Set the AC line voltage jumper as described in this installation section.
WARNING
:
Be sure the input voltage selection jumper is properly installed.
Incorrect installation of the input voltage selection jumper can cause
erratic operation and damage the equipment.
3.3.4
Mount the tracer head to the machine as shown on drawing DO-21683.
When determining the location for the 1100 and Tracer, keep in mind the
following factors.
§
accordance with the Environmental Operating Specifications of the
1100 and scanner
§
away from sources of moisture
§
avoiding undue sources of dust and other particles if possible
§
located so that unit and operator are out of areas of travel
§
unit and operator are away from zones through which objects may
accidentally fall, roll, or slide
§
away from sources of heat
§
away from combustible vapors or gasses
§
located so that cables can be routed safely to the unit
§
sufficient clearance for cables to exit the cabinet
§
access to rear panel to permit dis/connection of cables and reading of
labels on rear panel
§
field of view and physical environment of operator
3.3.5
Mount the Replicator CCD control unit to the machine using the mounting
diagram. The unit must always be mounted on top of a flat surface, using
Summary of Contents for 1100 CD
Page 20: ...Figure 1 3 Slowdown Marker ...
Page 34: ...BLANK ...
Page 56: ...BLANK ...
Page 58: ...Tools 40 Torch Lifter Controls 26 Tracer Function Keys 21 28 ...
Page 63: ...PART 7 DRAWINGS PART 7 DRAWINGS ...
Page 64: ...BLANK ...