background image

The Contractors Choice

thermOweld

®

ECN 2552 REV "E" 02/21/13        34-5381-01

+1 (918) 627-5210     •     1-800-558-1373     •     WWW.THERMOWELD.COM

ELECTRICAL GROUNDING  •  CATHODIC PROTECTION  •  ELECTRIC UTILITY  •  RAIL

Tel. +1.800.558.1373

 

Tel. +1.918.627.5210

www.thermoweld.com

INSTRUCTIONS FOR THERMOWELD GROUNDING CONNECTIONS - CABLE TO CABLE

CC-1

Butt cables under center 

of tap hole for 750 MCM 

and smaller.  For 800 MCM 

and larger, gap cables 1/8" 

under center of tap hole.

CC-5

Place end of lower cable to center 

of tap hole, then butt upper cable 

against lower cable.

CC-6

Place end of tap cable under center 

of tap hole.  Do not cut run cable or 

try to splice cables in this mold.

CC-2

Place run cable into mold.  Butt 

tap cable against run cable.  If 

cables are under tension, use 

38-0330-00 cable clamp.

CC-3

Butt tap cable against run 

cable.  Hold tap cable in place 

with 38-0330-00 cable clamp 

as shown.

CC-7

For 350 MCM and larger, cut and gap 

tap cable 1/4" under center of tap hole.  

Do not cut cable for heavy duty molds.

CC-11

With CC-11molds, cables are 

uncut.  If cables are under tension, 

use 38-0330-00 cable clamp.

CC-4

Butt tap cables against run cable.  

If cables are under tension, use 

38-0330-00 cable clamp.

Reviews: