The Contractors Choice
thermOweld
®
ECN 2552 REV "E" 02/21/13 34-5381-01
+1 (918) 627-5210 • 1-800-558-1373 • WWW.THERMOWELD.COM
ELECTRICAL GROUNDING • CATHODIC PROTECTION • ELECTRIC UTILITY • RAIL
Tel. +1.800.558.1373
Tel. +1.918.627.5210
www.thermoweld.com
INSTRUCTIONS FOR THERMOWELD GROUNDING CONNECTIONS - CABLE TO CABLE
CC-1
Butt cables under center
of tap hole for 750 MCM
and smaller. For 800 MCM
and larger, gap cables 1/8"
under center of tap hole.
CC-5
Place end of lower cable to center
of tap hole, then butt upper cable
against lower cable.
CC-6
Place end of tap cable under center
of tap hole. Do not cut run cable or
try to splice cables in this mold.
CC-2
Place run cable into mold. Butt
tap cable against run cable. If
cables are under tension, use
38-0330-00 cable clamp.
CC-3
Butt tap cable against run
cable. Hold tap cable in place
with 38-0330-00 cable clamp
as shown.
CC-7
For 350 MCM and larger, cut and gap
tap cable 1/4" under center of tap hole.
Do not cut cable for heavy duty molds.
CC-11
With CC-11molds, cables are
uncut. If cables are under tension,
use 38-0330-00 cable clamp.
CC-4
Butt tap cables against run cable.
If cables are under tension, use
38-0330-00 cable clamp.