background image

The Contractors Choice

thermOweld

®

+1 (918) 627-5210     •     1-800-558-1373     •     WWW.THERMOWELD.COM

ELECTRICAL GROUNDING  •  CATHODIC PROTECTION  •  ELECTRIC UTILITY  •  RAIL

Tel. +1.800.558.1373

 

Tel. +1.918.627.5210

www.thermoweld.com

INSTRUCTIONS FOR THERMOWELD GROUNDING CONNECTIONS - CABLE TO BAR

CB-2

Place bus bar into mold  Tap cable is gapped 

1/4" from upper edge of bus bar.

CB-6

Place bus bar into mold  Tap cable is gapped 1/4" 

from upper edge of bus bar.

CB-3                                  CB-7

Insert end of cable even with upper edge of bus bar.  

Pack cable opening with packing material when run bus 

is 3" or wider.

CB-4

Butt cable against edge of bus bar

CB-5

Butt tap bus or lug against side of run cable

CB-1

Butt end of cable and lug 

under center of tap hole.

CB-29

Place bus bar and cable into mold.

ECN 2552 REV "E" 03/05/13        34-5381-05

Reviews: