
38
Maintenance, cleaning
Support ring
Upper chevron seals
Upper pressure ring(s)
Pressure spring
Lower pressure ring
Lower chevron seals
Insertion direction for
packing gland parts
Spacer
Spindle diameter 22 mm
Fig. 35: Seal set for packing gland SP22
tightening torques of spindle
spindle
diameter
Orifice
body
material of
spindle guide
tightening
torque [nm]
10 mm
PEEK
6
15
1.4401 / 1.4404
/ 316L
15
20 – 25
25
32
50
14 mm
PEEK
15
25
1.4401 / 1.4404
/ 316L
25
32 – 50
60
22 mm
65
1.4401 / 1.4404
60
Tab. 19: Tightening torques of spindle
installing the control cone
→
Attach new control cone to the spindle.
→
Align bores of the control cone and spindle.
→
Support control cone on the cylindrical part with the aid of a
prism or something similar.
→
Put on dowel pin and carefully knock in with a hammer.
→
Position the dowel pin in the centre of the spindle axis.
english
Type 2300
Summary of Contents for 2300 Series
Page 44: ...44 english Type 2300 ...
Page 86: ...86 Typ 2300 deutsch ...
Page 128: ...128 Type 2300 français ...
Page 129: ......
Page 130: ...www burkert com ...