background image

Page 7

OPERATING CONTROLS

BREW SELECTOR SWITCH

Placing the switch in the 

1

2

 Gal, 1 Gal, or 1

1

2

 Gal position selects the amount of coffee to be brewed in sub-

sequent brew cycles.  Repositioning this switch after a brew cycle has been initiated does not change the brew 

batch in progress.

ON/OFF SWITCH

Placing the switch in the unlighted lower position cuts power to the brew station warmer and stops brew-

ing.  Stopping a brew cycle after it has been started will not stop the flow of water from the funnel.  Placing the 

switch in the lighted upper position supplies power to the brew station warmer and enables the brew circuit. 

START SWITCH

Momentarily pressing and releasing this switch starts a brew cycle when the On/Off switch is in the lighted 

upper position.

NOTE – 

The On/Off switch must be in the lighted upper position to initiate and complete a brew cycle.

COFFEE BREWING

1.  Select the desired batch size.

2.  Insert a BUNN filter into the funnel.

3.  Pour the proper amount of fresh coffee into the filter and level the bed of grounds by gently shaking.

4.  Slide the funnel into the funnel rails.

5.  Place an empty server under the funnel.

6  Place the On/Off switch in the lighted upper position.  Momentarily press and release the start switch.

7.  When brewing is completed, simply discard the grounds and filter.

CLEANING

1.  The use of a damp cloth rinsed in any mild, non-abrasive, liquid detergent is recommended for cleaning all 

surfaces on Bunn-O-Matic equipment.

2.  Check and clean the sprayhead.  The sprayhead holes must always remain open.

NOTE – 

In hard water areas, this may need to be done daily.  It will help prevent liming problems in the brewer 

and takes less than a minute.

27038 091900

Summary of Contents for SINGLE

Page 1: ...IN G SINGLE Serial SNG0005000 Up INSTALLATION OPERATING GUIDE BUNN O MATIC CORPORATION POST OFFICE BOX 3227 SPRINGFIELD ILLINOIS 62708 3227 PHONE 217 529 6601 FAX 217 529 6644 To ensure you have the latest revision of the manual or to obtain the illustrated parts catalog please visit the Bunn O Matic website at www bunn com This is absolutely FREE and the quickest way to obtain the latest catalog ...

Page 2: ...PURPOSE The agents dealers or employees of BUNN are not authorized to make modifications to this warranty or to make additional warranties that are binding on BUNN Accordingly statements by such individuals whether oral or written do not constitute warranties and should not be relied upon If BUNN determines in its sole discretion that the equipment does not conform to the warranty BUNN at its excl...

Page 3: ...ent must be installed to comply with the International Plumbing Code of the International Code Council and the Food Code Manual of the Food and Drug Adminis tration FDA For models installed outside the U S A comply with the applicable Plumbing SanitationCode 03408 0004 03409 0004 Artwork for P N 39803 0000 Artwork Rev A Drawn REF Date 02 26 07 MAIN ON OFF SWITCH 39803 0000 00824 0000 00824 0000 00...

Page 4: ...tallations of less than 25 feet and 3 8 for more than 25 feet from the 1 2 water supply line A tight coil of copper tubing in the water line will facilitate moving the brewer to clean the counter top Bunn O Matic does not recommend the use of a saddle valve to install the brewer The size and shape of the hole made in the supply line by this type of device may restrict water flow This equipment mus...

Page 5: ...g into the tank 3 When water stops flowing into the tank remove the front panel and proceed as directed Models with electronic control assemblies Place the tank heater switch at the top of the control assembly in the ON position and replace the front panel Models with electro mechanical thermostats Rotate the control thermostat knob fully clockwise to the ON position and replace the front panel 4 ...

Page 6: ...ilure to release the switch within two seconds after the third click causes the volume setting to be aborted and previous volume setting will remain in memory View the level of the liquid being dispensed When the desired level is reached turn the ON OFF switch to OFF lower The brewer remembers this volume and will continue to brew batches of this size until the volume setting procedure is repeated...

Page 7: ...ighted upper position NOTE The On Off switch must be in the lighted upper position to initiate and complete a brew cycle COFFEE BREWING 1 Select the desired batch size 2 Insert a BUNN filter into the funnel 3 Pour the proper amount of fresh coffee into the filter and level the bed of grounds by gently shaking 4 Slide the funnel into the funnel rails 5 Place an empty server under the funnel 6 Place...

Reviews: