background image

7

SWEETENER CALIBRATION 

(continued)

 

NOTE:  Only perform if you have a 40 ounce or 1000 milliliter container available with 1 ounce 

 

or 1 milliliter increments. 

 

NOTE:  Conversion for ml to oz: multiply by .033814. 
 

Conversion for oz to ml: multiply by 29.5735.

1.  Press and hold right hidden button until the display 

reads CALIBRATE FLOW?.

2.  Press the right hidden button again.

3.  Continue untill PASSWORD screen appears.
 

NOTE:

 

Password is 

6601

 

continued >

1

2

3

4.  Press the 

+

 button (UNSWEET) to choose number.

5.  Press the >>>> button (CONFIRM NEW BIB) to 

move to next number.

 

Repeat steps 4 and 5 until all four digits are added.

6. Press 

Done (SWEET).

 The 

SET LANGUAGE screen will appear.

8. Select 

Yes

.

9.  Place an empty measuring container under dilution 

nozzle. Use the Coca-Cola Universal Measuring Cup 
(CCP#12754)  - This measurement is in milliliters (ml).

6

7.  Press the right hidden button to advance to the 

CALIBRATE SWEET screen.

 

NOTE:

 

This takes approximately 16 steps.

7

4

5

10. Display will say CONTAINER READY?.
 Press 

Yes (UNSWEET) button.

11. Display will show CAL FLOW SWEET 1.
 Press 

Yes (UNSWEET) button.

10

9

11

8

Summary of Contents for McDonald's ITCB

Page 1: ...002 G 3 20 2015 Bunn O Matic Corporation SERVICE SUPPLEMENT Bunn O Matic Corporation Post Office Box 3227 Springfield Illinois 62708 3227 Phone 217 529 6601 Fax 217 529 6644 www bunn com McDonald s IT...

Page 2: ...by such individuals whether oral or written do not constitute warranties and should not be relied upon If BUNN determines in its sole discretion that the equipment does not conform to the warranty BUN...

Page 3: ...low for table or cart to pull out from wall for cleaning Install tubing in method to minimize kinking Chilled Water Supply Line Chilled water to be plumbed to dilution inlet labeled on the back of the...

Page 4: ...1011 12422 0011 TO LOWER FITTING ON DILUTION NOZZLE ASSEMBLE WITH O RING TOWARDS INLET VALVE ASSEMBLE CFV IN SWEETENER ASSY TO BRACKET AS SHOWN ASSEMBLE THERMISTOR ASSEMBLY IN SWEETENER ASSEMBLY TO B...

Page 5: ...o rings 48895 0002 O Ring 48895 0001 O Ring 40071 0010 Check Valve Sst To Barb W Viton 50615 0001 Fitting Thermistor 10K Ntc 50093 0004 Fitting Barb Bulkhead Thermistor 41766 0003 Cf Valve Assembly S...

Page 6: ...er by holding down the center yellow button Confirm New BIB 3 This will be a 20 second countdown 4 To confirm that both BIB 1 and BIB 2 are primed you should see two dots on the LCD screen as shown be...

Page 7: ...1 2 3 4 Press the button UNSWEET to choose number 5 Press the button CONFIRM NEW BIB to move to next number Repeat steps 4 and 5 until all four digits are added 6 Press Done SWEET The SET LANGUAGE sc...

Page 8: ...g calibration be sure to press start again on calibration with empty container immediately after previous reading 12 Display shows measure 1 15 Record the final reading on the sweetener value screen 1...

Page 9: ...CIPE NO YES ENABLE SANITATION NO DONE YES ENABL ENERGYSAVR NO DONE YES ENABLE FRESH TIMER NO DONE YES XX REFILL XXX DONE SPRAY OZ M XX X DONE FACTORY DEFAULTS NO YES SERVICE TOOLS NO YES SET RECIPES T...

Page 10: ...T CALIBRATE SPRAY 60 SEC TO FINISH SPRAYHD OZ XX X DONE NEW SPRAY FLOW XX X OZM DILUTION CAL NO YES CONTAINER READY QUIT YES CALIBRATE DILUTE QUIT START CALIBRATE DILUTE 60 SEC TO FINISH NEW DILUTE FL...

Page 11: ...11...

Page 12: ......

Reviews: