INSTALLATION
It is the responsibility of the installing contractor to comply with all applicable codes and
regulations. It is the responsibility of the installing contractor to ensure adequate service clearance
for regular maintenance or for when repair in place is exercised. The installing contractor will be
responsible for removing the unit if it is not serviceable in place.
DELIVERY AND GENERAL INSTALLATION CHECKLIST
1.
Remove packaging and inspect the unit. Check for shipping damage or material
shortage; file a freight claim and notify your sales representative if damage or
deficiency is found.
2.
Verify the model.
3.
Verify that the power supply complies with the nameplate specification.
4.
Reinstall card board sleeve on unit to protect during construction.
NOTE: Insulation of the water piping loop is not required except where piping runs through
unheated areas or areas on the exterior of the building. The normal loop operating
temperature range is 85°F (29°C) to 120°F (49°C).
Installation Procedure
1.
This heat pump unit is to be installed within an indoor environment. Locate the unit in
an area where the surrounding air temperature is above 45°F (7°C) at all times. Do not
attempt to locate the unit in an area that may be subjected to freezing conditions.
2.
Determine the mount location of the heat pump unit in accordance with the clearances
specified on page 4, as well as the location of the building’s water and electrical supply
lines. Receptacle, Electrical Box and Piping and Receptacle Plate are all sold separately.
These components are optional and may be supplied by others.
3.
Position the Piping-and-Receptacle Plate, when supplied; see Figure 1 Piping and
Receptacle Plate (optional) over the building’s supply, return, and condensate fluid
lines. Install isolation valves on each of the pipes to facilitate removal and servicing of
the unit in the future. Flush lines prior to installation of hoses to the building’s supply
and return lines. See Figure 2 and Figure 3.
4.
Screw hanging strip to the drywall by locating the studs. Hanging strip design includes
various holes to ensure that stud spacing and location isn’t an issue during installation.
The hanging strip must be level. See Drawing 1
5.
Hanging strip must be mounted 23-1/8” high to ensure the console unit rests on the