User Guide
157
www.bull.com
Installing the Processor Air Duct
1.
Make sure the power switches for the computer, video monitor and any
peripheral devices are turned OFF and unplug the power cord (see
“General
Safety Information” on page 126
).
2.
Disconnect the monitor and peripheral devices (printers, for instance) from the
system.
3.
Remove the server cover. Refer to
“Removing the Server Cover” on page 154
.
4.
Lower the air duct into place: insert the two hooks at the front of the processor
air duct into the corresponding slots on the bracket behind the two system
blower fans.
Note: Use caution not to pinch or disengage cables that
may be near or under the air duct.
Figure 105: Installing the Processor Air Duct
5.
Replace the server cover. Refer to
“Installing the Server Cover” on page 155
.
Summary of Contents for NovaScale R410 E1
Page 1: ...NovaScale T810 E1 T830 E1 R410 E1 User s Guide NOVASCALE REFERENCE 86 A1 15FA 00 ...
Page 2: ......
Page 34: ...User Guide 34 www bull com Motherboard Motherboard Layout Figure 14 Motherboard Layout ...
Page 53: ...User Guide 53 www bull com SAS Hard Disk Drive Capacity 73GB minimum 15000 RPM RAID support ...
Page 318: ......
Page 319: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 15FA 00 ...