
P2.x ATEX
9.5 Dimensions
P2.2 Atex, P2.72 Atex – standard versions
P2.4 Atex, P2.74 Atex – versions with intermediate flange
Mounting bracket
View with pump
head rotated
111
264
309
100
120
126
169
205
186
63
9
130
253
142
174
214 (235 for 115 V versions)
130
100
Installation notices:
1) This pump should be installed horizontally
2) If necessary, rotate the pump head during installation. When conveying gasses with condensate content it must be
installed valves down.
361
116
245
Adjustable bypass valve
(optional)
100
130
110
94
79
Cabinet cut-out for pumps with
intermediate flange
7
View A
18
7
40
max. 30
Intermediate flange
80
24
150
Three-phase versions
without capacitor
33
Bühler Technologies GmbH
BE420002 ◦ 07/2022