P2.x ATEX
6.1 Maintenance schedule
Component
Interval
Work to be performed
To be performed by
Pump body screws
After 500 h
Tighten screws to 3 Nm
Customer
Complete pump
Every 500 h
Check hose connections, protective and control
devices, proper function, dirt.
Replace if damaged or have repaired by Bühler Tech-
nologies.
Customer
Complete pump
Every 8,000 h or under high
dust load
Clean the entire pump,
see
Customer
Valves
Every 8,000 h or if pressure
drops
Check valves, replace valves if necessary,
see
Replacing the inlet and outlet valves
Customer
Bellow
Every 4,000 h or 6 months
Check by shutting off the suction pipe. Repair if dam-
aged,
see
low and connecting rod-eccentric-combination.
Customer
Complete pump
After 43,800 h or 5 years
Inspection through Bühler Technologies
Item no. see
Order number for the 43.800h inspection
Service technician /
Bühler Technologies
Coupling
(P2.4-/P2.74-ATEX)
After 2,000 h or 3 months,
then every 4,000 h or 6
months
Initial elastomer ring gear inspection, see Inspecting
and replacing the flexible spider.
Customer
20
Bühler Technologies GmbH
BE420002 ◦ 07/2022