Commissioning
Commissioning must only be carried out by the heating
system installer or an authorised contractor.
B
Check all connections for leaks.
B
Commission the heating system – observe the
installation and operating instructions of the control
unit, heat source and solar thermal system.
7
Shutting down
B
Shutting down the heating system – observe the
installation and operating instructions of the control
unit, heat source and solar thermal system.
B
Open the system drain valve.
B
Open the air vent valve to vent.
B
Fully drain the buffer cylinder and dry the inside.
8
Environmental protection/
disposal
Environmental protection is one of the fundamental
company policies of the Bosch Group.
Quality of products, efficiency and environmental
protection are equally important objectives for us. All
legislation pertaining to the environment is strictly
observed. To protect the environment we use the best
possible technology and materials, subject to economics.
Packaging
We are dedicated in adhering to country-specific disposal
standards as they relate to packaging to ensure optimum
recycling. All packaging materials are environmentally
compatible and can be recycled.
Used appliances
Old appliances contain materials that should be recycled.
The relevant assemblies are easy to separate, and all
plastics are identified. This allows the various assemblies
to be appropriately sorted for recycling or disposal.
9
Maintenance
The buffer vessel has to be maintained in accordance with
local standards. In addition the buffer needs to be visually
inspected.
B
Check all connections externally for leaks once a year.
Contact an authorised contractor or customer service
and notify them of the fault as well as the appliance
details.
NOTE:
Risk of material damage due to
incorrectly set pressure on the heating water
side.
B
Observe maximum permissible values
(
Æ
Table 3, page 4 and Table 5,
DANGER:
Risk of scalding through hot
water.
B
Allow the buffer cylinder time to cool down
sufficiently after being shut down.
NOTE:
Cylinder damage through frost.
If there is a risk of frost, we recommend
leaving the buffer cylinder operational or
shutting it down and draining it.
Summary of Contents for Logalux PR 750-120
Page 27: ...1 Logalux 6 720 649 880 2011 03 27 1 1 1 99 1 2 B B B B 60 C B B B B B 2 29 30...
Page 31: ...6 Logalux 6 720 649 880 2011 03 31 5 6 B B 6 B B 7 B B B B 8 Bosch 9 B B B B B 31 28 33 28 B...
Page 33: ...1 Logalux 6 720 649 880 2011 03 33 1 1 1 99 1 2 B B B B 60 C B B B B B 2 36 37...
Page 37: ...6 Logalux 6 720 649 880 2011 03 37 5 6 B B 6 B B 7 B B B B 8 Bosch 9 B B B B B 38 34 40 34 B...
Page 45: ...1 Logalux 6 720 649 880 2011 03 45 1 1 1 99 1 2 B B B B 60 C B B B B B 2 o 50 51...
Page 49: ...6 Logalux 6 720 649 880 2011 03 49 5 6 B B 6 B B 7 B B B B 8 Bosch M 9 B B B B B 52 46 54 46 B...
Page 93: ...1 Logalux 6 720 649 880 2011 03 93 1 1 1 99 1 2 B B B B B 60 C B B B B B 2 106 107...
Page 97: ...6 Logalux 6 720 649 880 2011 03 97 5 6 B B 6 B B 7 B B B B B B B B 108 94 110 94 B...
Page 98: ...8 Logalux 6 720 649 880 2011 03 98 8 Bosch 9 B...
Page 104: ...Bosch Thermotechnik GmbH Sophienstrasse 30 32 D 35576 Wetzlar www buderus com...