5 | Installation
BÜCHI Labortechnik AG
20/56
Operation Manual SyncorePlus
5
Installation
5.1
Before installation
NOTICE
Instrument damage due to switching it on too early.
Switching on the instrument too early after transportation can cause damage.
u
Climatize the instrument after transportation.
5.2
Installation site
NOTE
Make sure that the power supply can be disconnected at any time in an emergency.
The installation site must meet the following requirements:
Firm, level surface.
Take into account the weight of the set up and the samples.
Do not place loose papers or cloths below or to the sides of the instrument, as
these could impede the air circulation if drawn in.
Do not place the instrument near vibration-sensitive devices.
Make sure that cables / tubes can be routed safely.
Own mains outlet socket
5.3
Establishing electrical connections
NOTE
Observe the legal requirements when connecting the instrument to the power supply.
4
Use additional electrical safety features (e.g., residual-current circuit breakers) to
comply with local laws and regulations.
The power supply must fulfil the following conditions:
1. Provide the mains voltage and frequency specified on the type plate of the instru-
ment.
2. Be designed for the load imposed by the instruments connected.
3. Be equipped with suitable fuses and electrical safety features.
4. Be equipped with proper earthing.