6 Operation
41
K-439
Operation Manual, Version B
• If applicable, follow the previous steps to install a suction module on a second rack.
• Switch on the Scrubber or water jet pump and activate the fume hood ventilation.
➡
The rack(s) can now safely be processed in the SpeedDigester.
Note
• Clean all glass parts before mounting to avoid cross contamination.
• When a water jet pump is used, hazardous vapours can escape into the environmental air if the
suction is inadequate.
• If a Scrubber without condensation step is used, the condensate that accrues must be absorbed
by means of a Woulff bottle between the SpeedDigester K-439 and the Scrubber.
• When operating with 3rd party sample tubes no insulation caps and glass caps are available. In
this case, all positions must be equipped with samples!
• When operating with 300 ml sample tubes, close unused positions with a glass cap towards the
suction unit.
6 .7 .4
Installing 500 ml sample tubes
Unlike 300 ml (and 250 ml) sample tubes, 500 ml tubes can not simply be inserted into the appro-
priate rack. The information in this section serves to set up this type of sample tube properly and
safely in the rack.
Installation steps:
For installation and handling all parts must be < 40 °C!
*CL
ICK
*
1
2
3
frontside
rear side
• Plug the rack into the carrier
1
.
➥
Two audible *click* sounds will appear as soon as the rack is securely locked at the carrier!
➥
Check the locking by lifting the rack together with the carrier (carrier must follow the rack)
Summary of Contents for SpeedDigester K-439
Page 1: ...11593351 en SpeedDigester K 439 Operation Manual...
Page 67: ......