Büchi Labortechnik AG
Product description | 3
Operation Manual Dehumidifier S-396 Nano
13/24
Component
Materials of construction
Reservoir
St 1.4301
Silver solder
Phosphor solder
EPDM
Evaporator
Aluminum
Copper
Connections
Stainless steel
Woulff bottle
Glass
Hoses
Silicone
3.5.4
Installation site
The installation site has a firm, level surface.
The installation site allows that the power supply can be disconnected at any time
in an emergency.
The installation site has enough space that cables / tubes can be routed safely.
The installation site has no obstacles (e.g. water taps, drains, etc.).
The installation site is not exposed to external thermal loads, such as direct solar
radiation.
The installation site meets the requirements for the connected devices. See
related documentation
The installation site meets the specifications according to the technical data (e.g.
weight, dimension, etc.). See Chapter 3.5 "Technical data", page 11
The installation site meets the requirements of the safety data sheets for all
solvents and samples used.
There is no loose paper or the like at the installation site that could drawn in the
ventilation.
The installation site has an own mains outlet socket for the instrument.
The electric installation meets the requirements. See Chapter 5 "Installation",
page 15 and Chapter 3.5 "Technical data", page 11
Summary of Contents for S-396 Nano
Page 1: ...Dehumidifier S 396 Nano Operation Manual 11594350 A en ...
Page 23: ......