1
BÜCHI
Rotavapor
R-220
Table of Contents
Table of Contents
en, Version F (46 Pages)
Ordering No.
R-220 Operation Manual
96737
Read this Operating Manual through carefully before using
the
Büchi
Rotavapor
R-220
. Always keep these Instructions
readily available in the immediate vicinity of the unit so that
they make be consulted at any time.
Chapter 2 contains important safety rules which must be ob-
served to ensure the safe operation of the rotary evaporator.
We reserve the right to make technical changes without
prior notification. No portion of this Operating Manual
may be reproduced, processed using electronic or optical
systems, duplicated, or distributed in any form without
the prior written approval of Büchi Labortechnik AG.
All rights reserved. © Büchi Labortechnik AG, 1999-2001
6
Maintenance
23
6.1
Taking Apart the Snap Flange Coupling
23
6.2
Assembling the Snap Flange Coupling
24
6.3
Removing the Evaporating Flask Seal
24
6.4
Inserting the Evaporating Flask Seal
25
6.5
Replacement of the Seals for the Distribution Head 25
6.6
Replacement of the Vacuum Seal
26
6.7
Cleaning
26
6.8
Vacuum Seal
26
6.9
Testing for Leaks
27
6.10 Customer Service
27
7
Taking out of Operation
28
8
Spare Parts and Accessories
29
8.1
Glass Assemblies D, D2, DB, DB2
30/31
8.2
Glass Assemblies R, RB, C
32/33
8.3
Miscellaneous
34
8.4
Accessories
37
9
Appendix
42
9.1
Technical Data
42
9.2
Materials Used
42
9.3
Error Messages
43
9.4
FCC requirements (for USA and Canada)
44
9.5
Declaration of Conformity
45
1
Scope of Delivery
2
2
Safety
3
3
Function
6
3.1
Principle of Operation
6
4
Putting into Operation
7
4.1
Installation Location
7
4.2
Unpacking
7
4.3
Setting up the Support Rod
8
4.4
Attachment of the EasyClamp
9
4.5
Removal of the EasyClamp
9
4.6
Installation of the Reflux Glass Assembly
10
4.7
Installation of the Descending Glass Assembly
11
4.8
Installation of the Descending Glass Assembly
with a 2
nd
Cooler
12
4.9
Installation of the Receiving Fixture
13
4.10 Attaching and Removing Flasks
14
4.11 Hose Coupling
16
4.12 Operating the Shut-off tap
18
4.13 Bath Replenishment (Optional)
18
4.14 Reset of the over-temperature protection
19
4.15 Heating Medium
19
4.16 Checking Installation
19
5
Operation
20
5.1
Arrangement of the Operator Control and
Display Elements
20
5.2
Adjusting the Maximum Set-Point Temperature
and Automatic Lowering of the Bath in Case of
a Power Interruption
20
5.3
Tips and Tricks
21
5.4
Table of Solvents
22