
BÜCHI Labortechnik AG
Operation | 6
Operation Manual Pure Chromatography Instrument C-805
43/70
u
Connect the solvent line.
6.4.2
Installing and removing a cartridge
NOTE
Removing is done in reverse sequence.
NOTE
Instead of a cartridge a bypass can be installed.
NOTE
The automatic reading of the cartridge information can only be done with specific
BUCHI RFID tagged cartridges.
4
The indication for recognizing the cartridge is a sound.
u
Open the solvent line at the point indicated.
u
Hold the cartridge above the RFID reader.
u
Wait until the instrument has taken over the
cartridge data.
u
Attach the cartridge to the cartridge holder.