NIR-Online GmbH
Installation | 5
Operation Manual Process Analyser PA2
21/36
5.4
Installation (example)
Production
Zone 21
Production
Zone 22
Server/Control room
Remote computer
Installation box
with mains adapter
Sensor cables
(power supply,
RS 422)
Video cable
USB converter
1 sensor per measurement
point
Up to 4 sensors per computer
(up to 2 sensors with CCD camera per computer)
Process control system
SX-Client
Display:
- Results
- Charts
Chemometric
software
manual calibration
SX-Plus
Remote access via Ethernet
Video/Frame
grabber card
USB
Optional
interfaces:
-Profibus
-4-20 mA
-TCP/IP
-OPC
-Modbus
Control center
Product flow
Zone 20
Data cable
(RS422)
Video
filter
5.5
Establishing installation point
The fixing points or bolts conform to M6 A2-70/7.3 Nm.
Establish the installation point according to the specified data of the flange.