5 Putting into operation
47
B-90
Operation Manual, Version B
5.4.2
Spray head installation
The spray head can be mounted at the spray head holder in either an angular or horizontal position.
The most appropriate position depends on the sample product and its spray drying requirements. In
all three angular positions the thermal load of the spray head is considerably decreased because the
spray head is out of the central flow of the hot drying gas. This makes the angular position an option
for spraying heat-sensitive materials.
30°
30°
30°
45°
60°
30°
30°
30°
45°
60°
1
For angular spray head position:
• To set the angulation of the spray head holder
remove the angulation screw
a
first. Then swivel
the spray head holder to the desired angle (30°,
45° or 60°) and reattach the screw in the chosen
angle. Fasten the screw again.
•
To mount the spray head, use a small torx screw
(M3×1
6
) to fix it at the holder
b
.
For vertical spray head position:
To mount the spray head in vertical position
c
, use a
small torx screw to fix it at the holder.
5.5
Peristaltic pump and feed tubing installation
The peristaltic pump uses a pulley drive to transport liquids through the tubing. The pump design is
dry run safe. During the spray drying process it constantly feeds the spray head with sample liquid.
Notice
Risk of instrument short-circuits and damage by liquids.
• Do not spill liquids over the instrument or parts of it
• Wipe off any liquids instantly
• Place the sample vessel onto the designated reservoir-plate on top of the instrument
• Ensure a safe positioning of the sample vessel
• Do not move the instrument when it is loaded with liquid
• Keep external vibrations away from the instrument
Summary of Contents for Nano B-90
Page 1: ...093261 en Nano Operation Manual Spray Dryer B 90...
Page 2: ......
Page 102: ......
Page 103: ......