5 | Installation
Büchi Labortechnik AG
30/118
Operation Manual Lyovapor™ L-300/L-300 Pro
1
3
2
Fig. 15: Fitting the drain tube
1
Side connections
See Chapter 3.2.3 "Side connec-
tions", page 18
2
Drain tube
3
Connection for condensate drain
tube
u
Switch the On/Off master switch to Off.
u
Fit the drain tube (4) onto the connection marked Drain 1 (5).
u
Fix the drain tube in place with a hose clip.
u
Fit another drain tube onto the connection marked Drain 2.
5.2.6
Fitting the fill-level sensor on the receiving vessel (optional)
Fig. 16: Position of fill-level sensor in receiving vessel
u
Fix the sensor on the receiving vessel below the condensate drain tube.