5 | Installation
Büchi Labortechnik AG
28/118
Operation Manual Lyovapor™ L-300/L-300 Pro
2. Be designed for the load imposed by the instruments connected.
3. Be equipped with suitable fuses and electrical safety features.
4. Be equipped with a proper earthing.
u
Make sure that all connected devices are earthed.
u
Make sure that the power plug is freely accessible at all times.
u
Insert the power plug into the power socket.
5.2.3
Fitting the fresh water connections
NOTICE
Risk of instrument damage from scale formation
u
Use distilled water.
u
Do not connect to mains water supply.
NOTE
u
Use only the containers supplied.
u
Place container at the same level as the instrument.
1
3
2
Fig. 13: Fitting the fresh water connections
1
Side connections
See Chapter 3.2.3 "Side connec-
tions", page 18
2
Tube for fresh water
3
Connection for fresh water
Precondition:
R
Summary of Contents for Lyovapor L-300
Page 1: ...Lyovapor L 300 L 300 Pro Operation Manual 1153869 D en...
Page 117: ......