6 | Operating the control panel
Büchi Labortechnik AG
42/100
Operation Manual Lyovapor™ L-200/L-200 Pro
View
Status
Manual Drying
The instrument is in the course of a manual
freeze-drying process.
Recovering
The system is in the process of recovering from a
power failure (> 15 min).
The current parameters of the freeze-drying
process are being re-established.
Reconditioning
The instrument is restarting after a temporary
power failure (< 15 min).
Symbols on the status bar
Symbol
Status
The instrument is connected to the BUCHI Cloud.
The instrument is defrosting.
The instrument is starting up.
The instrument is in energy-saving mode.
Before the freeze-drying process:
Load the top-mount drying rack with a frozen
sample.
After the freeze-drying process:
Remove the dried sample from the top-mount
drying rack.
The system evacuates to the set pressure.
The instrument is performing a vacuum test or a
leak test.
6.5
Carrying out freeze-drying
6.5.1
Preparing the instrument
Time
re-
quired:
approx.
30min
NOTE
To minimize the condensation of moisture from the air in the condenser, place a
drying rack.
Navigation path
➔
Start
u
Navigate to the
[Start]
menu via the navigation path.