5 | Installation
BÜCHI Labortechnik AG
34/102
Operation Manual Interface I-300 Pro
u
Position the rear plate (4) of the two-part wall bracket on the wall. Note: the word
"UP" stamped in the rear plate must be at the top.
u
Option 1: peel protective foil off the back of the plate and press the plate firmly
against the wall/glass panel in the desired position so it is held in place by the self-
adhesive pad.
u
Option 2: mark the positions of the four holes in the rear plate, drill four holes in
the wall in those positions and fix the plate to the wall using screws.
u
Position the interface unit (2) on the outer face of the front plate (1) and fix it in
place using three screws (3).
u
Fit the front plate together with interface unit onto the rear plate. As you do so, lo-
cate the lugs (6) on the front plate in the slots (5) on the rear plate and then press
the front plate down.
5.2
Connecting the Interface I-300/I-300 Pro
The Interface I-300/I-300 Pro can be connected either to an individual BUCHI labora-
tory device or to a complete distillation system.
3
4
5
1
3
4
5
1
Fig. 12: Interface unit, VacuBox, Rotavapor, vacuum pump and recirculating chiller
1
Recirculating Chiller F-3xx
4
Vacuum Pump V-300
2
Rotavapor R-300 with Heating Bath
B-300
5
Interface I-300/I-300 Pro
3
VacuBox
A complete BUCHI distillation system typically consists of the following components:
Rotavapor R-300 with heating bath
Vacuum Pump V-300
Recirculating Chiller F-3xx
VacuBox
Interface I-300/I-300 Pro
Data communication between the BUCHI laboratory equipment takes place via the
standard BUCHI communication ports. See Chapter 5.2.3 "Overview: Setting up com-
munication connections (COM)", page 36.
The refrigerant circulates around the distillation system through a separate tubing
system. See Chapter 5.2.4 "Overview: setting up coolant tubing connections",
page 36.