BTCPower L3R-50-208-01-003 Installation And User Manual Download Page 4

 
 

 

 

 

 

 
 

 

50 kW DC Fast Charger 

INSTALLATION AND USER’S MANUAL

 

Page 

4

 of 

26

 

 

This document is the 

Property of BTCPower Inc.

 and shall not be 

copied, reproduced, or used as the basis for sale or manufacture 
of apparatus without written permission. 

29-May-19 

 

Initial Release 

 

 

1.

 

Safety Guidelines 

SAVE THESE INSTRUCTIONS 

This document contains important instructions for the installation, operation, and maintenance 
of 

50kW DC Fast Charger

.  These instructions should be retained for future reference. 

 

1.1.

 

Important Safety Instructions 

 

WARNING 

READ THIS MANUAL BEFORE YOU BEGIN 

This 

50kW DC Fast Charger

 manages electricity and may be hazardous.  The equipment should 

be installed, adjusted, and serviced only by qualified electrical personnel familiar with the 
construction and operation of this type of equipment and the hazards involved, and in full 
compliance with all local and national codes and standards. Failure to observe this precaution 
could result in severe injury or death. 

Read this manual completely and become familiar with the equipment prior to performing any 
procedures specified in the manual and energizing the equipment.  Inspection and 
maintenance of this equipment should be performed in accordance with the procedures 
detailed in this manual. 

In situations where it is not possible to perform an installation following the procedures specified 
in this document, contact BTCPower, Inc.  BTCPower, Inc. will not be responsible for any 
damages that may occur resulting from custom installations that are not specified in this 
document. 

There are no user serviceable parts inside.  For service, please contact customer service or your 
local distributor.  

DO NOT ATTEMPT TO REPAIR THE CHARGE STATION YOURSELF.  SERVICE TO THE 

UNIT SHALL ONLY BE PERFORMED BY A QUALIFIED PERSONNEL.

 

If your charging cable is somehow damaged, do not operate the charge station.  Contact your 
service representative for service immediately.  Shut down the power to the charger by 
switching the breaker on the supply panel to the off position. 

 

SAFETY GUIDELINES 

Summary of Contents for L3R-50-208-01-003

Page 1: ...50 kW DC Fast Charger INSTALLATION AND USER S MANUAL BTCPOWER INC 1719 S GRAND AVE SANTA ANA CA 92705 WWW BTCPOWER COM...

Page 2: ...d its installation BTCPower Inc reserves the right to make changes to this product without further notice No part of this document may be reproduced in any form or by any means electronic or mechanica...

Page 3: ...and Definitions 5 2 System Overview 6 2 1 Equipment Description 6 2 2 Equipment Specification 7 3 Pre Installation 8 3 1 Location Selection 8 3 2 ADA Consideration 9 4 Installation 11 4 1 Mounting Pro...

Page 4: ...his precaution could result in severe injury or death Read this manual completely and become familiar with the equipment prior to performing any procedures specified in the manual and energizing the e...

Page 5: ...ls affixed to the equipment unit DANGER Indicates High Voltage It calls attention to items or operations that could be dangerous to person s operating this equipment Read and follow the instructions c...

Page 6: ...directly charge an electric vehicle s lithium ion battery It is capable to charge all electric vehicles compliant with CHAdeMO charging system and Combined Charging System CCS standards 2 1 Equipment...

Page 7: ...772 Combo CCS1 Network Compatibility OCPP 1 5 1 6 BTCP Network Access Control Communication RFID Credit Card 4G Cat 5 Ethernet Input Power 208 VAC 3 Phase 480 VAC 3 Phase Full Load Amperage 177 A 72 A...

Page 8: ...Determining Suitability of Site for Cellular Connectivity o Ensure that installation location meets the Cellular Signal Strength Criteria below Parameter Min Value Device Notes RSSI 69 dBm SureCall I...

Page 9: ...dations and commercial facilities to be readily accessible to and usable by individuals with disabilities Adoption of the 2010 Standards also establishes a revised reference point for Title II entitie...

Page 10: ...ormation about the ADA including the revised 2010 ADA regulations please visit the Department s website www ADA gov or for answers to specific questions call the toll free ADA Information Line at 800...

Page 11: ...caution could result to severe injury or death WARNING The equipment may be installed outdoors but only use under environment conditions as stated in this document Do not perform any live wire operati...

Page 12: ...s the basis for sale or manufacture of apparatus without written permission 29 May 19 Initial Release 4 1 Mounting Procedures 4 1 1 Clearance Around the Unit Clearance surrounding the charger must be...

Page 13: ...ture of apparatus without written permission 29 May 19 Initial Release Charger Installation Drawing continuation 4 1 2 Charger Mounting The Charger must be fixed on a concrete pad using four 4 x 3 McM...

Page 14: ...d reproduced or used as the basis for sale or manufacture of apparatus without written permission 29 May 19 Initial Release Charger Footer Drawing The illustration below shows the drilling layout for...

Page 15: ...oduced or used as the basis for sale or manufacture of apparatus without written permission 29 May 19 Initial Release 4 2 Electrical and Communication Service Connection 4 2 1 Electrical Service Entra...

Page 16: ...ation Conduit is to be routed per NEC standards 50KW Charger 480VAC 3 Phase Input 50KW Charger 208VAC 3 Phase Input 3 AWG Line for each phase 3 0 AWG Line for each phase 3 AWG GROUND wire 3 0 AWG GROU...

Page 17: ...h measure 120VAC to Neutral Earth Ground must be connected to Neutral at only one point usually at the Service Entry of the Breaker Panel Electrical Connection Connect 3 Phase 208VAC or 480VAC to the...

Page 18: ...ut written permission 29 May 19 Initial Release 5 Operation 5 1 Charging Session and Operating Procedure SCREEN DESCRIPTION SCREEN 1 WELCOME SCREEN Displays Connector Options Select CCS Combo CHAdeMO...

Page 19: ...aratus without written permission 29 May 19 Initial Release SCREEN DESCRIPTION SCREEN 4 Charging Receipt Text Message Option Enter Phone Number and Press Submit or Press Skip SCREEN 5 Authorizing Paym...

Page 20: ...ower Inc and shall not be copied reproduced or used as the basis for sale or manufacture of apparatus without written permission 29 May 19 Initial Release SCREEN DESCRIPTION SCREEN 8 Charging Stopped...

Page 21: ...produced or used as the basis for sale or manufacture of apparatus without written permission 29 May 19 Initial Release 5 2 Stop Procedure 50kW DC Fast Charger offers three 3 ways to stop the charging...

Page 22: ...facture of apparatus without written permission 29 May 19 Initial Release 5 3 Time Outs If for any reason the charge session does not begin within 60 seconds after payment has been processed CHARGING...

Page 23: ...s If there is abnormal sound please contact a BTC Power representative for further assistance Check for abnormal odor changes of inner materials corrosion anomaly in appearance etc in this device If t...

Page 24: ...in breach of the Limited Warranty BTCPower will upon written notice of the defect received during the Warranty Period either repair or replace at BTCPower s election the Product if it proves to be def...

Page 25: ...butor or by an authorized installer or service provider Improper site preparation or maintenance Damage as a result of accidents extreme power surge extreme electromagnetic field Use of the Product wi...

Page 26: ...e Property of BTCPower Inc and shall not be copied reproduced or used as the basis for sale or manufacture of apparatus without written permission 29 May 19 Initial Release REVISION HISTORY Revision D...

Reviews: