![BTCPower EVP-2001-30-W-001 Installation And User Manual Download Page 10](http://html1.mh-extra.com/html/btcpower/evp-2001-30-w-001/evp-2001-30-w-001_installation-and-user-manual_2824942010.webp)
AC Level 2 Charger
INSTALLATION AND USER’S MANUAL
Page
10
of
59
This document is a
Property of BTCPower Inc.
and shall not be
copied, reproduced, or used as the basis for sale or manufacture
of apparatus without written permission.
09-Mar-20
Revision
T
5.
Pre-Installation
Prior to performing any installation activities, it is important to read through each of the items
outlined in this section, which are essential for the installation process.
5.1.
Location Selection
Items to consider when choosing a location to install the unit:
•
Standards for Accessible Design (refer to section 5.2)
•
Conformance to all governing standards for location and placement of the charger
•
Communications Connectivity (refer to section 5.3)
•
Local Conditions
o
Area is not exposed to high temperatures, dust, corrosive fumes, combustible materials,
or explosive gases
o
Area is dry and well-ventilated
o
Clearances at both sides for proper ventilation
o
Clearance at front and sides for accessibility during service (refer to Section 6.1.1)
o
Wiring and conduit needed to connect the charger to the circuit panel
o
Location of vehicle
’s
charging inlets while parked
o
Use of protective bollards and wheel stops to protect the charger
PRE-INSTALLATION