background image

935CA: Installation, Start-up, Operating and Service and Maintenance Instructions

Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.

37

Optional Installation of the Vent Pipe

NOTE: 

DO 

NOT  USE  THIS  TECHNIQUE 

FOR

POLYPROPYLENE VENTING SYSTEMS.

This option provides a disconnect point for the vent pipe. The vent pipe

must be cemented to the plastic vent pipe adapter to maintain a sealed

vestibule, see 

Fig. 55

.

1. Insert a length of vent pipe through the casing into the outlet of the

vent elbow.

2. Slide the plastic vent pipe adapter over the length of the vent pipe

down to the furnace casing. Mark the pipe where it is flush with the

outlet of the adapter.

3. Remove the pipe from the furnace and the adapter and cut off any

excess pipe.

4. Clean  and  prime  the  end  of  the  pipe  that  is  flush  with  the  vent

adapter with a primer that is appropriate for the type of pipe being

used.

5. Re-insert the pipe through the casing into the vent elbow.
6. Tighten the clamp around the outlet of the vent elbow. Torque the

clamp to 15 lb-in. 

7. Apply cement to the end of the pipe and to the inside of the plastic

vent adapter. 

8. Slide the adapter over the vent pipe and align the screw holes in the

adapter with the dimples in the furnace casing.

9. Pilot  drill  1/8-in.  screw  holes  for  the  adapter  in  the  casing  and

secure the adapter to the furnace with sheet metal screws.

10. Loosen the clamps on the rubber vent coupling.
11. Slide the end of the coupling with notches in it over the standoffs in

the vent pipe adapter.

12. Tighten  the  clamp  of  the  coupling  over  the  vent  pipe  adapter.

Torque the lower clamp around the vent pipe adapter to 15 lb-in.

13. Pilot drill a 1/8-in. hole in the combustion air pipe adapter.
14. Complete the vent and combustion air pipe as shown in “Install the

Vent

 

and Combustion Air Pipe.”

A13076A

A13076B

Fig. 55 – Optional Vent Pipe Flush with Adapter 

Installing the Vent Termination

Roof Terminations

A roof termination of any type will require a 4-in. (102 mm) flashing for

a  2  in.  (50  mm  ND)  concentric  vent  or  a  5-in.  diameter  (127  mm)

flashing  for  a 3-in.  (80 mm ND)  concentric vent kit.  For  two-pipe  or

single  pipe  vent  systems,  a  flashing  for  each  pipe  of  the  required

diameter will be necessary. 
It is recommended that the flashing be installed by a roofer or competent

professional prior to installing the concentric vent. The terminations can

be installed on a flat or pitched roof.

Concentric Vent

Single  or  multiple  concentric  vent  must  be  installed,  see 

Fig. 62

.

Maintain the required separation distance between vents or pairs of vents

(see 

Fig. 62

) and all clearance, see 

Fig. 60

.

NOTE: 

Follow the instructions of the vent terminal manufacturer. These

instructions are provided as a reference, only.
Cut one 4-in. (102 mm) diameter hole for 2-in. (50 mm ND) kit, or one

5-in. (127 mm) diameter hole for 3-in. (80 mm ND) kit in the desired

location. 
Loosely  assemble  concentric  vent/combustion  air  termination

components together using instructions in kit.
Slide assembled kit with rain shield 

REMOVED 

through hole in wall or

roof flashing.

NOTE: 

Do not allow insulation or other materials to accumulate inside

of pipe assembly when installing it through hole.
Disassemble  loose  pipe  fittings.  Clean  and  cement  using  same

procedures  as  used  for  system  piping. 

DO  NOT  CEMENT

POLYPROPYLENE FITTINGS.

Two-Pipe and Single-Pipe Terminations

Single  and  two  pipe  vent  must  be  installed,  see 

Fig. 62

  and 

Fig. 63

.

Maintain the required separation distance between vents or pairs of vents

(see 

Fig. 62

 and 

Fig. 63

) and all clearances, see 

Fig. 60

 and 

Fig. 61

.

WARNING

!

CARBON MONOXIDE POISONING HAZARD

Failure to follow this warning could result in personal injury or death.

DO NOT

 use cement to join polypropylene venting systems. Follow

the  polypropylene  venting  system  manufacturer’s  instructions  for

installing polypropylene venting systems.

NOTICE

!

FOR POLYPROPYLENE VENTING SYSTEMS

When using polypropylene venting systems, all venting materials used, 

including the vent terminations, must be from the same manufacturer.

VENT PIPE FLUSH SHOWING COUPLING

ALIGN NOTCHES IN VENT PIPE
COUPLING OVER STAND-OFF 
ON ADAPTER. TORQUE LOWER
CLAMP 15 LB-IN. WHEN REMAINING 
VENT PIPE IS INSTALLED, TORQUE
UPPER CLAMP TO 15 LB-IN.

Summary of Contents for 935CA

Page 1: ...as Heat Values at Altitude 80 000 50 Table 23 Gas Valve Outlet Pressure for Gas Heat Values at Altitude 100 000 51 Table 24 Gas Rate CU ft hr 51 Table 25 Blower Off Delay Setup Switch 52 SERVICE AND M...

Page 2: ...exterior of the building at a minimum height of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign...

Page 3: ...lteration service maintenance or use can cause carbon monoxide poisoning explosion fire electrical shock or other conditions which may cause personal injury or property damage Consult a qualified serv...

Page 4: ...rged outdoors Connect this furnace to an approved vent system only as specified in the Venting section of these instructions 5 Never test for gas leaks with an open flame Use a commercially available...

Page 5: ...furnace Excessive oversizing of the furnace may cause the furnace and or vent to fail prematurely customer discomfort and or vent freezing Failure to follow these guidelines is considered faulty inst...

Page 6: ...Y WIRE CONNECTED TO THE CONTROL PRIOR TO DISCHARGING YOUR BODY S ELECTROSTATIC CHARGE TO GROUND 2 Firmly touch the clean unpainted metal surface of the furnace chassis which is close to the control To...

Page 7: ...Cements and glues Antistatic fabric softeners for clothes dryers Masonry acid washing materials All fuel burning equipment must be supplied with air for fuel combustion Sufficient air must be provided...

Page 8: ...tion and ventilation air depend upon whether or not the furnace is located in a space having a volume of at least 50 cubic feet per 1 000 BTUh input rating for all gas appliances installed in the spac...

Page 9: ...te permanent ventilation openings directly to outdoors having free area of at least 1 in 2 4 000 BTUh of total input rating for all gas appliances in the space 3 In spaces that use the Indoor Combusti...

Page 10: ...148 6 0 30 2 100 59 4 2 800 79 2 3 500 99 1 1820 51 5 2 800 79 2 3 000 84 9 4 000 113 2 5 000 141 5 6 000 169 8 7 000 198 1 0 20 3 150 89 1 4 200 118 9 5 250 148 6 2730 77 3 4 200 118 9 4 500 127 3 6...

Page 11: ...ndensate drain line Wrap the drain trap and drain line with the heat tape and secure with appropriate plastic ties Follow the heat tape manufacturer s recommendations Prime the trap before furnace ope...

Page 12: ...eck that all pre installed gaskets on trap components are present adhered and undamaged Table 5 Condensate Trap Configurations Part Installation Configuration Horizontal Upflow Upflow Offset Required...

Page 13: ...uration Trap Interference A200120 Fig 18 Upflow Right Side Return Configuration Required Upflow Offset Installation WARNING CARBON MONOXIDE POISONING HAZARD Failure to follow this warning could result...

Page 14: ...llow for 6 3 8 162 mm of clearance underneath the furnace for the condensate trap and drain line It is recommended to leave an additional 1 clearance under the trap for service see Fig 21 4 Remove app...

Page 15: ...ional condensate piping to a code approved drain or to a condensate pump approved for use with acidic furnace condensate and compatible with mineral and vegetable oils such as canola oil 8 Allow at le...

Page 16: ...and front to back It is allowable to add up to 1 2 in additional slope over length and depth of coil cabinet in the direction of drain pan connection 5 Attach coil casing to furnace using sheet metal...

Page 17: ...Table 11 footnotes for other return air restrictions A200426 Fig 28 Upflow Return Air Configurations and Restrictions A200425 Fig 29 Horizontal Return Air Configurations and Restrictions NOTE Refer to...

Page 18: ...ks or bricks Condensate Trap section for required and recommended clearances for trap installation see Fig 6 Fig 21 and Fig 32 Suspended Furnace Support The furnace must be supported under the entire...

Page 19: ...of the bottom and downward facing side may also be used The upward facing side of the casing cannot be used as a return air connection see Fig 29 Bottom Return Air Inlet These furnaces are shipped wit...

Page 20: ...s sealed to the furnace casing and terminating outside the space containing the furnace Secure ductwork with proper fasteners for type of ductwork used Seal supply and return duct connections to furna...

Page 21: ...661 0 07 17 0 12 31 0 13 33 0 20 51 0 31 79 1600 755 0 08 19 0 15 38 0 16 40 0 24 61 1800 850 0 08 21 0 18 47 0 18 47 0 29 73 2000 944 0 09 23 0 22 56 0 21 54 2200 1038 0 09 24 0 26 66 0 25 62 Face V...

Page 22: ...810 1805 1785 CF Switches SW3 3 SW3 2 SW3 1 Low Clg Default OFF OFF ON 695 700 Note 4 Cooling SW2 Low Cooling SW3 OFF ON OFF 870 885 880 880 Note 4 OFF ON ON 1045 1060 1070 1070 1070 1070 Note 4 ON OF...

Page 23: ...ore and during supply pipe pressure test After all connections have been made purge lines and check for leakage at furnace prior to operating furnace The gas supply pressure shall be within the maximu...

Page 24: ...7 8 inch for 115 VAC Electric GAS SUPPLY MANUAL SHUT OFF VALVE REQUIRED SEDIMENT TRAP UNION NOTE Union may be inside the vestibule where permitted by local codes FRONT WARNING ELECTRICAL SHOCK FIRE OR...

Page 25: ...0263 A190264 Fig 38 Installing J Box When Used External Electrical Box on Furnace Casing NOTE Check to ensure that external electrical box does not interfere with duct work gas piping or the indoor co...

Page 26: ...in relief wire tie on furnace wiring harness 5 Connect field ground wire and factory ground wire to green ground screw on J Box mounting bracket see Fig 38 6 Connect power cord power and neutral leads...

Page 27: ...trolled by a standard type thermostat Refer to the instructions supplied with the User Interface for complete details Alternate Power Supplies This furnace is designed to operate on utility generated...

Page 28: ...MAXIMUM FUSE OR CKT BKR AMPS Time delay type is recommended Maximum Minimum 48060C17 115 60 1 127 104 11 4 12 6 14 29 15 60080C21 115 60 1 127 104 14 3 15 4 12 37 20 66100C21 115 60 1 127 104 14 3 15...

Page 29: ...Speed Variable Furnace with Single Speed Air Conditioner A190369 Fig 44 1 Speed Variable Furnace with Two Speed Air Conditioner A190368 Fig 45 1 Speed Variable Furnace with Single Speed Heat Pump Dual...

Page 30: ...enting systems This furnace is also CSA approved for venting with M G DuraVentR PolyProR or Centrotherm InnoFlueR polypropylene venting systems using single wall straight and flex and required fitting...

Page 31: ...ewall For references to clearances required by National code authorities see Fig 60 OPTIONAL CONFIGURATION FOR COMBUSTION Ventilated Combustion Air Systems In a ventilated combustion air option the ve...

Page 32: ...6 Termination or termination kit should be positioned where vent vapors are not objectionable Direct Vent 2 Pipe System Direct vent 2 pipe vent and combustion air pipes must terminate outside the stru...

Page 33: ...umber of fittings multiplied by the deduction for each type of fitting used see Table 19 A200089 NOTE Only connect combustion air inlet moisture drain downstream of the furnace trap assembly as shown...

Page 34: ...used for Alberta and Saskatchewan terminations NOTE Polypropylene venting systems MAY require additional deductions from the MEVL or additions to the TEVL for vent terminations and flexible pipe secti...

Page 35: ...nnection see Fig 12 Use a flat blade screwdriver and tap on the knockout on opposite sides where the knockout meets the casing Fold the knockout down with duct pliers and work the knockout back and fo...

Page 36: ...PYLENE VENT SYSTEMS SEE POLYPROPYLENE VENT SYSTEM MANUFACTURER S INSTRUCTIONS 13 After pipes have been cut and pre assembled apply generous layer of cement primer to pipe fitting socket and end of pip...

Page 37: ...in 102 mm flashing for a 2 in 50 mm ND concentric vent or a 5 in diameter 127 mm flashing for a 3 in 80 mm ND concentric vent kit For two pipe or single pipe vent systems a flashing for each pipe of t...

Page 38: ...cation for termination kit using the guidelines provided in section Locating The Vent Termination in this instruction 1 Cut two holes one for each pipe of appropriate size for pipe size being used 2 L...

Page 39: ...y See Notes for Venting Options Notes for Venting Options 1 Attach vent pipe adapter with gasket to furnace casing 2 Align notches in rubber coupling over standoffs on adapter Slide clamps over the co...

Page 40: ...636 ULC S636 Royal Pipe Schedule 40 ULC S636 ULC S636 ULC S636 ULC S636 PVC and ABS pipe may use either DWV or pressure rated fittings Colored or tinted solvents or primers must be used where required...

Page 41: ...in some cases 13 Elbow and pipe sections within the furnace casing and at the vent termination should not be included in vent length or elbow count 14 The minimum pipe length is 5 ft 2 M linear feet m...

Page 42: ...ere 70 ft 22 M Use length of the longer of the vent or air inlet piping system Add equiv length of 3 90 long radius elbows use the highest number of elbows for either the vent or inlet pipe 3 x 3 ft 0...

Page 43: ...located on public property 7 ft 2 1 M Clearance under a veranda porch deck or balcony N P No operable windows doors or intakes of any type are permitted on Wall B between the vent termination and the...

Page 44: ...12 in 305 mm for appliances 50 000 BTUh 15kW K Clearance to a mechanical air supply inlet 6 ft 1 8 M 3ft 9 M above if within 10 ft 3 M horizontally L Clearance under a veranda porch deck or balcony 12...

Page 45: ...he side of the opening 1 ft 3M above the opening Manufacturer s Recommendation See Note 8 K Clearance to a mechanical air supply inlet 6 ft 1 8 M 3ft 9 M above if within 10 ft 3 M horizontally L Clear...

Page 46: ...172mm for 2 in 51mm Abandoned masonry used as raceway per code 12 in 305 mm min from overhang or roof Maintain 12 in 305mm minimum clearance above highest anticipated snow level or grade whichever is...

Page 47: ...and Continuous Fan airflows The Setup Switch locations are shown and described on Fig 65 The setup switches are also shown on the unit wiring label Setup Switches SW1 The furnace control has 8 setup...

Page 48: ...are used for applications using a communicating User Interface and to adjust airflow SW4 3 is used to adjust airflow Refer to the Adjustments section for setup switch configurations Refer to User Inte...

Page 49: ...een 4 5 in w c 1125 Pa and 13 6 in w c 3388 Pa i Remove jumper across thermostat connections to terminate call for heat Wait until the blower off delay is completed j Turn furnace gas valve electric s...

Page 50: ...3 0 1525 800 2 4 2 5 2 6 2 7 2 7 2 8 825 2 3 2 3 2 4 2 5 2 6 2 7 to 850 2 1 2 2 2 3 2 4 2 4 2 5 875 2 0 2 1 2 2 2 2 2 3 2 4 900 1 9 2 0 2 0 2 1 2 2 2 2 5400 925 1 8 1 9 1 9 2 0 2 1 2 1 1646 950 1 8 1...

Page 51: ...00 950 2 1 2 2 2 2 2 3 2 4 2 4 914 975 2 0 2 0 2 1 2 2 2 3 2 3 1000 1 9 1 9 2 0 2 1 2 1 2 2 775 2 9 3 0 3 1 3 1 3 1 3 1 800 2 7 2 8 2 9 3 0 3 1 3 1 3001 825 2 6 2 6 2 7 2 8 2 9 3 0 915 850 2 4 2 5 2 6...

Page 52: ...l truncate at 2200 CFM on applicable models The high speed or single speed cooling airflow is adjusted by turning Setup switches SW2 1 SW2 2 and SW2 3 either ON or OFF Select the required airflow from...

Page 53: ...must be performed by trained service personnel A qualified service person should inspect the furnace once a year General These instructions are written as if the furnace is installed in an upflow app...

Page 54: ...be present at control and all blower OFF delays must be completed a Leave 115 v power to furnace turned on b Look into blower access door sight glass for current LED status c Remove blower door NOTE...

Page 55: ...lower wheel and motor annually The inducer and blower motors are pre lubricated and require no additional lubrication Clean blower motor and wheel as follows 1 Turn off electrical supply to furnace 2...

Page 56: ...b on the housing 11 Reinstall blower assembly in furnace 12 Reinstall two screws securing blower assembly to blower deck NOTE Refer to motor speed lead relocation if leads were not identified before d...

Page 57: ...0 Turn power on at external disconnect fuse or circuit breaker 11 Run the furnace through two complete heating cycles to check for proper operation 12 Install control door when complete Servicing Hot...

Page 58: ...ing Condensate Drain and Trap NOTE If the condensate trap is removed a new gasket between the trap and collector box is required Verify a condensate trap gasket is included in the service kit or obtai...

Page 59: ...furnace control door WARNING ELECTRICAL SHOCK FIRE OR EXPLOSION HAZARD Failure to follow this warning could result in personal injury or death or property damage Before installing modifying or servic...

Page 60: ...ive seconds after the GVR closes a 2 second flame proving period begins The HSI igniter will remain energized until the flame is sensed or until the 2 second flame proving period begins d Flame Provin...

Page 61: ...the DHUM input logic is reversed The DHUM input is turned ON when no dehumidify demand exists Once 24 vac is detected by the furnace control on the DHUM input the furnace control dehumidification capa...

Page 62: ...pump See Fig 42 and thermostat wiring for connections When installed with a heat pump the furnace control automatically changes the timing sequence to avoid long blower off times during demand defros...

Page 63: ...setup switch SW1 1 in the ON position The AMBER LED are erased after 72 hours or can be manually erased by putting setup switch SW1 1 in the ON position and jumpering R W W1 and Y Y2 simultaneously s...

Page 64: ...during the trial for ignition period the control will repeat the ignition sequence 3 more times before lockout 14 occurs Iffl ame signal is lost during the blower on delay period blower will come on...

Page 65: ...ither the BLACK or WHITE power leads between the furnace control and the blower motor If you have a power choke disconnect it and check continuity YES YES NO NO Is there 12 VDC at PL13 7 RED and PL13...

Page 66: ...t up Operating and Service and Maintenance Instructions Manufacturer reserves the right to change at any time specifications and designs without notice and without obligations 66 346011 2 revA A200312...

Page 67: ...sh Poor inducer flow Excess wind 31 PRESSURE TRANSDUCER INPUT DOES NOT SENSE TARGET PRESSURE OR PRESSURE IS OUT OF RANGE Check for Excessive wind Proper vent sizing Restricted vent Defective inducer m...

Page 68: ...company of your choice BRYANT HEATING COOLING SYSTEMS a division of Carrier Corporation 7310 West Morris Street Indianapolis IN 46231 U S A Have available the model number series number and serial num...

Reviews: