APRON ASSEMBLY
FIGURE ONE
Step #1.
With rail assembly remaining upside down,
position the apron brackets into the groove with the word
“FRONT” facing away from the rail. Place each bracket
approximately 3 - 4” from each end of the rail. With the
brackets rmly seated in the bottom of the groove, attach
them to the back of the rail core with #6 x 3/4”
at head screws.
FIGURE ONE
FIGURE TWO
Step #2.
Position the aprons into the grooves so the ends
of apron and rails are even. Make sure the top of the
apron is seated against the bottom of the rail groove.
Attach the brackets to the back of the apron with
#8 x 1/2” pan head screws.
FIGURE TWO
FIGURE THREE
Step #3.
Using a partner, carefully turn the rail and
pocket assembly over and lower over the table.
Step #4.
Align the eighteen machine studs with the
eithteen clearance through the slate and lower the
assembly onto the slate.
Step #5.
Thread the 3/8-16 hex nut and dome washer
onto the machine stud (three places) at the ends of the
table and tighten securely.
Step #6.
Making sure that the side rails are in a straight
line as sighted down the length of the table (cushion
side), fasten the side rails securely with remaining nuts
and dome washers.
Step #7.
Attach pocket tabs to underside of slate frame
pad with nails, or 1/2” staples.
Step #8.
Thoroughly brush the area on which the bed
spots are to be applied. Position the bed spot and rmly
roll a ball over the spot to achieve good adhesion.
NOTE:
Bed spots are self adhesive.