
56
ZTKS0156 / Z31820 / Rev.: 03
Assembling
4.3.3.2
Mounting the Rotary Valve Column
Figure 4.37: Mounting the Cold Head - step 5
13. Set the M 5 adjustment screws (1) to the
turret flange and tighten them by one turn.
The cold head is lifted 0.8 mm.
14. Fix the adjustment screws (1) with the three
nuts on top of the cold head flange.
15. Attach the three M 6 fixing screws (3). Do
not tighten these screws yet.
16. Slightly grease the O-ring and sealing sur-
face of the KF 16 flange before assembling
the pressure relief valve (2).
17. Assemble the pressure relief valve (2) to the
KF 16 flange.
18. Slightly grease the O-ring and sealing sur-
face of the KF 16 flange before mounting
the stop valve (2).
19. Assemble the stop valve (2) to the KF 16
flange and open it.
Figure 4.38: Rotary Valve Column - overview
1 Noise protection cover
2 Stand plates (each 3x)
3 Base supports (3x)
4 Noise protection cap
5 Base plate
6 Profile rail
7 Adapter plate
8 Front plates
9 Sliding blocks
10 Accessories
11 Profile cap
12 Velcro® fastener
13 Flex line positioning disc
14 Stand plates (2x)
Summary of Contents for RS
Page 1: ...NMR Spectroscopy Service Manual RS ...
Page 4: ...4 ZTKS0156 Z31820 Rev 03 ...
Page 8: ...8 ZTKS0156 Z31820 Rev 03 Table of Contents ...
Page 10: ...10 ZTKS0156 Z31820 Rev 03 Contact ...
Page 14: ...14 ZTKS0156 Z31820 Rev 03 Introduction ...
Page 36: ...36 ZTKS0156 Z31820 Rev 03 Transportation ...
Page 86: ...86 ZTKS0156 Z31820 Rev 03 Operation ...
Page 112: ...112 ZTKS0156 Z31820 Rev 03 Troubleshooting ...
Page 132: ...132 ZTKS0156 Z31820 Rev 03 Disassembling ...
Page 134: ...134 ZTKS0156 Z31820 Rev 03 Appendix ...
Page 136: ...136 ZTKS0156 Z31820 Rev 03 Appendix ...
Page 142: ...142 ZTKS0156 Z31820 Rev 03 Appendix ...
Page 144: ...144 ZTKS0156 Z31820 Rev 03 Appendix ...
Page 150: ...150 ZTKS0156 Z31820 Rev 03 Technical Data RS Service This side is intentionally left blank ...
Page 156: ...156 ZTKS0156 Z31820 Rev 03 ...