26
Z31823_00_05
Software
5.3.2.1
Configuration of the Graphical Display
At the top half of the Graphic Display are several checkbox‘s and fields that can be used
to configure the graphical display representation to your individual needs. By selecting or
deselecting checkbox‘s and/or entering parameters you can specify your requirements.
For example, you can select up to 3 channels from the Channel Selection bar to be dis-
played on the selected graph. In the example below T1 and T2 parameters for Graph 1
have been selected (Group Box „Graph Selection“).
Figure 5.6 Graphical Display - Configuration X-axis
For each graph you can subsequently configure the X-axis (time) and the Y-axis (size)
display to conform to individual requirements.
The configuration of the X-axis can either be an interval display or a filtered display
based on a specified date.
•
Interval display
: The desired number of day to be represented, as well as the final
date can be entered. The last logbook entry can be displayed by clicking on „Last
Date“. When you also select the auto-refresh option the graphical display will be
automatically updated when a new logbook entry is made. In this case entering a
Last Date is not possible.
1. Channel Selection T1 & T2
2. Graph Selection Graph 1
3. Interval Selection
4. Last Date
5. Auto Refresh
6. Filtered by Date Selection
1
2
3
4
5
6
Summary of Contents for BMPC/2
Page 8: ...8 Z31823_00_05 Table of Contents...
Page 14: ...14 Z31823_00_05 Safety...
Page 20: ...20 Z31823_00_05 Principles of Operation...
Page 42: ...42 Z31823_00_05 Alarm System...
Page 62: ...62 Z31823_00_05 Hardware Overview...
Page 64: ...64 Z31823_00_05 Maintenance and Cleaning...
Page 86: ...86 Z31823_00_05 Troubleshooting Figure 11 10Replacing the Control Unit Fuse Fuse Insert...
Page 122: ...122 Z31823_00_05 Technical Data...
Page 124: ...124 Z31823_00_05 Contact...
Page 126: ...126 Z31823_00_05 Warning Signs...
Page 130: ...130 Z31823_00_05 Figures...
Page 132: ...132 Z31823_00_05 Tables...
Page 135: ......