
98 (167)
BRUKER
Installation Manual Version 001
Circuit Diagrams
Testing the Installation
11.5.2
Copy the program BACSTEST from the floppy onto your hard drive. Go into the
monitor program and key in „BACSTEST“. You can now control the sample
changer by entering commands through the keyboard. For further information re-
fer to the B-ACS
B-ACS Bus Terminator
11.6
Figure 11.32.B-ACS Bus Terminator Board
1
26
25
2
BUS TERMINATOR
H3P0413B
BASEITE
TP1
TP2
TP3
R1
1
0
K
1
N
44
48
1
N
44
48
BC
23
9
R1
1
0
K
T2
T3
BD242C
T4
BD241C
2x SK13
SE
N
S
O
R
C
TERM
INATOR BUS
ST STIF
T 64W
PR
T AU
C
4
233
4-A1
91-A5
02
AR1
ARRAY 2
7
0
AR2
ARRAY
2
7
0
AR5
ARRA
Y
2
7
0
A
R
6
ARRAY 2
7
0
AR3 ARRAY 3K3
AR4 ARRAY 3K3
IC5 74LS688
IC3 74LS244
T1
BC
177
VR1 1K
+
_
C1
10
µ
F
C6
10N
+
_
C2
10
µ
F
C7
10N
+
_
C3
10
µ
F
C8
10N
+
_
C4
10
µ
F
C9
10N
+
_
C5
10
µ
F
C14
100N
C11
330P
IC1
LM308AN
D1 D2
C12
100N
C10 47
µ
F/100V
+
1
Summary of Contents for B-ACS 120
Page 1: ...BRUKER Version Bruker Automated Control Systems B ACS 60 120 Installation Manual 001...
Page 7: ...Installation Manual Version 001 BRUKER 7 167 1 Declaration of Conformity 1...
Page 10: ...10 167 BRUKER Installation Manual Version 001 Introduction...
Page 40: ...40 167 BRUKER Installation Manual Version 001 Operating Instructions...
Page 56: ...56 167 BRUKER Installation Manual Version 001 Special Tools...
Page 60: ...60 167 BRUKER Installation Manual Version 001 Technical Data...
Page 150: ...150 167 BRUKER Installation Manual Version 001...
Page 160: ...160 167 BRUKER Installation Manual Version 001 Figures...
Page 167: ...Installation Manual Version 001 BRUKER 167 167 Lastpage...