Installation and Operation of the BTS 150 and BTS 500 Chambers
96
DOC-M88-EXX268_V1_12.2016
Figure 9.1: Fixing screws for the BTS 150/500 adapter
5. Attach the chamber to the mount by inserting the micrometer screws in the back into
the designated holes in the mount.
6. Feed the heater power cable, the USB cable, and the vacuum/gas tubes (optional),
through the labyrinth.
If necessary, connect the vacuum tubes to a vacuum pump or to the desired gas source
(the chamber supports inert gases such as N
2
and He as well as air). The chamber takes
4 mm gas or vacuum tubing that can be plugged directly into the connectors at the top of
the chamber (see figure above).
Summary of Contents for Anton Paar
Page 6: ...Contents 6 DOC M88 EXX268_V1_12 2016 ...
Page 12: ...List of Figures 12 DOC M88 EXX268_V1_12 2016 ...
Page 26: ...General Remarks 26 DOC M88 EXX268_V1_12 2016 ...
Page 34: ...Vacuum Equipment 34 DOC M88 EXX268_V1_12 2016 ...
Page 135: ...DOC M88 EXX268_V1_12 2016 135 ...
Page 136: ...Bruker Corporation info baxs bruker com www bruker com Order No DOC M88 EXX268 ...