Installation and Operation of the CHC plus Humidity Chamber
68
DOC-M88-EXX268_V1_12.2016
Figure 7.13: RS232 connections from UIOB to Julabo Heating Circulator and water connections
1
to RS232-I | UIOB X2
4
to relay box
2
Water bath inlet from CHC plus
5
Water bath outlet to CHC plus
3
Water bath outlet (to drain)
6
Water bath inlet (from tap)
The Julabo controller configuration was set to ‘remote’ at Bruker AXS to allow operation
by the DIFFRAC.Measurement software, no further changes are required.
Summary of Contents for Anton Paar
Page 6: ...Contents 6 DOC M88 EXX268_V1_12 2016 ...
Page 12: ...List of Figures 12 DOC M88 EXX268_V1_12 2016 ...
Page 26: ...General Remarks 26 DOC M88 EXX268_V1_12 2016 ...
Page 34: ...Vacuum Equipment 34 DOC M88 EXX268_V1_12 2016 ...
Page 135: ...DOC M88 EXX268_V1_12 2016 135 ...
Page 136: ...Bruker Corporation info baxs bruker com www bruker com Order No DOC M88 EXX268 ...