Installation Instructions 125 MAX DD2 evo
Page 37/70
Edition 09/2016
K00399 / Fig. 56
Æ
Establish a connection between the overflow socket on the radiator filling socket and
the overflow bottle with an appropriate piece of hose.
¢
Attention: To warrant the best possible engine cooling, ensure that the air stream covers the
complete radiator area.