Assembly Instructions
Page 12
Fig. 17
b.
Align the side shelf holes (Fig.17) with the two screws in burner box side panel and the one in the
control box side panel, and push the shelf down to lock it in place. Then open the hood and use the
two 1/4-20 x 1 3/8
"
screws (H) to fasten the side shelf (AB) from inside the burner box. Refer to
Fig. 18 & Fig. 19(from inside the burner box). Then tighten the three screws loosened previously.
Fig. 18 Fig. 19
Step 11: Install Side Cooker Shelf
Required: (1) Side Cooker Shelf (F), (2) 1/4-20 x 1 3/8
"
screws (H)
Warning: The side cooker shelf assembly should be handled carefully.
a.
Loosen the two screws attached in the right panel of
the burner box and one attached on the right panel of
the control box 3-4 turns (See Fig. 20). Parts are not
to be installed in this step. Just loosen the three
screws.
Fig. 20 Fig. 21
Assembly Holes
Screw Here
Side Shelf
Assembly Holes
Screw
Here
Summary of Contents for BR4GRILL
Page 103: ......
Page 104: ...Distributed By Camp Chef P O Box 4057 Logan UT 84323 Printed in China ...