
III - 67
2.14
Reassembly of the Bottom Cover and the Main Chassis
Insert the end of the size detection PCB harness into the hole in the bottom cover,
and set it into hooks A, B, C, and D, as shown in Fig. 3.84.
Size detection PCB harness
D
C
B
A
Fig. 3.84
Set the thermistor to the bottom cover and secure it in place using tape. Then, pass
the connector through hole A.
Pass the paper feed motor harness through hole C in the bottom cover.
Pass the drawer connector harness through hole B in the bottom cover.
Bundle all other harnesses coming out of the main chassis, and pass them through
hole A in the bottom cover.
Secure the harness of the transparent sensor assy B and the switch for the xenon
cassette with the harness of the transparent sensor assy A and the switch for
opening/closing the cover using fastening band L100, as shown in Fig. 3.85.
Paper feed motor harness
C
Main chassis
Bottom cover
Rib A
A
B
Harness of switch for
xenon reset
Harness of transmission
sensor assy B
Drawer connector
harness
Fastening band L100
Thermistor harness
Fig. 3.85
Note: Arrange the harnesses at the left of rib A.
Summary of Contents for SC-2000
Page 1: ...Stamp Creator PRO SERVICE MANUAL MODEL SC 2000 Version A ...
Page 2: ...Stamp Creator PRO SERVICE MANUAL MODEL SC 2000 ...
Page 13: ...I 7 Fig 1 6 ID Label 1438 Fig 1 7 ID Label 1850 Fig 1 8 ID Label 2770 ...
Page 118: ...II 4 Fig 2 2 Block Diagram of the Electronic Part ...
Page 132: ...III 14 Fig 3 15 Stamp Size Detection Open Cover Detection and Key Scanning Circuit ...
Page 138: ...III 20 Fig 3 21 Control Panel PCB Circuit ...
Page 144: ...APP 1 ...
Page 145: ...APP 2 ...
Page 146: ...APP 3 ...
Page 147: ...APP 4 D 100V AC System Power Supply Circuit ...
Page 148: ...APP 5 E 200V AC System Power Supply Circuit ...
Page 149: ...APP 6 ...
Page 150: ...Sep 98 5V5014BE0 Printed in Japan ...