Installation
High Capacity Helium Compressor
Supply and Return Water Line Connections
Manual
8040600
Brooks Automation
4-4
Revision A
Supply and Return Water Line Connections
NOTE: The water used for cooling the High Capacity Helium Compressor
must meet the specifications outlined in
.
Hard Water Lines
1. Remove the protective cap from the male ORS fitting on the High
Capacity Helium Compressor.
2. Make sure the O-ring is located on the male ORS fitting.
3. Install the Supply hard line into the IN connection on the rear panel of
the High Capacity Helium Compressor. Tighten the fitting by hand.
4. Install the Return hard line into the OUT connection on the rear panel
of the High Capacity Helium Compressor. Tighten the fitting by hand.
5. Using a wrench, tighten the fittings.
6. Turn on the water, and verify that there are no water leaks.
Fittings Damage
Do not overtighten the fittings. Damage to the input and output connector
threads can occur.
Flexible Water Lines
1. Remove the protective cap from the male ORS fitting on the High
Capacity Helium Compressor.
2. Make sure the O-ring is located on the male ORS fitting.
Barbed Fittings Damage
Do not overtighten the fittings. Damage to the input and output connector
threads can occur.
3. Connect the Supply flexible water line to the IN ORS fitting and
secure.
4. Connect the Return flexible water line to the OUT ORS fitting and
secure.
5. Turn on the water, and verify that there are no water leaks.