9
Installation and Operation Manual
X-DPT-Profibus-Interface-eng
PN 541-C-068-AAG
November, 2008
2
PRODUCT OVERVIEW
2.1 General
This section contains the procedures for the receipt and installation of the instrument. Do not
attempt to start the system until the instrument has been permanently installed. It is extremely
important that the start-up procedures be followed in the exact sequence presented.
NOTE:
Operating procedure:
do not operate this instrument outside the specification range
listed in section 5.
Before bringing the unit into operation, make sure that all gas connections have been correctly
tightened and that all the necessary electrical connections have been made.
2.2 Receipt of Equipment
When the equipment is received, the outside packing case should be checked for damage
incurred during shipment. If the packing case is damaged, the local carrier should be notified at
once regarding his liability. A report should be submitted to your nearest Product Service
Department.
Brooks Instrument
407 W. Vine Street
P.O. Box 903
Hatfield, PA 19440 USA
Toll Free (888) 554-FLOW (3569)
Tel (215) 362-3700
Fax (215) 362-3745
E-mail: [email protected]
http://www.brooksinstrument.com
Brooks Instrument
Brooks Instrument
Neonstraat 3
1-4-4 Kitasuna Koto-Ku
6718 WX Ede, Netherlands
Tokyo, 136-0073 Japan
P.O. Box 428
Tel 011-81-3-5633-7100
6710 BK Ede, Netherlands
Fax 011-81-3-5633-7101
Tel 31-318-549-300
E-mail: [email protected]
Fax 31-318-549-309
E-mail:[email protected]
Remove the envelope containing the packing list. Carefully remove the instrument from the
packing case. Make sure spare parts are not discarded with the packing materials. Inspect for
damaged or missing parts.