background image

Bronkhorst®

Instruction Manual FLOW-CONTROL series

9.17.115B

11

3

Operation

After correct installation and taking all necessary safety precautions, the FLOW-CONTROL is ready to be used.

3.1

First use

Before using the FLOW-CONTROL with corrosive, reactive or explosive media, purging for at least 30 minutes with a dry,

inert gas (like Nitrogen or Argon) is strongly recommended. After use with these media, purging is also recommended,

before exposing the instrument to air.

3.2

Points of attention

Check the system for leaks before applying pressure, especially if toxic, explosive or other dangerous fluids are used.

Be sure to apply the specified operating pressure(s). Avoid pressure shocks and bring the fluidic system gradually up to the

level of  operating conditions; open and close the fluid supply gently.

Do not pressurize the instrument beyond the maximum working pressure, stated on the instrument label.

When closing the valve, do not tighten the control knob with excessive force.This might damage the sealing surface of the

needle valve, which seriously reduces performance. The needle might even get jammed in the valve seat, blocking the flow

permanently.

Summary of Contents for FLOW-CONTROL Series

Page 1: ... 2018 ATTENTION Pleaseread this Instruction Manualcarefully beforeinstalling and operating theinstrument Notfollowing theguidelines could resultin personalinjury and ordamageto theequipment FLOW CONTROL series Instruction Manual ...

Page 2: ...ationwill facilitatetheuseoftheinstrument and or contributetoitsoptimal performance Additional infoavailableontheinternet or from your local salesrepresentative Receipt of equipment Check the outside package box for damage incurred during shipment If the box is damaged then the local carrier must be notified at once regarding his liability if so required At the same time a report should be submitt...

Page 3: ...afety precautions This product is intended for use by qualified personnel who recognize shock hazards and are familiar with the safety precautions required to avoid possible injury Read the operating information carefully before using the product Before operating make sure the line cord is connected to a properly grounded power receptacle Inspect the connecting cables for cracks or breaks before e...

Page 4: ...Bronkhorst Instruction Manual FLOW CONTROL series 9 17 115B 4 ...

Page 5: ...scription 7 Process 1 3 1 8 Wetted materials 1 3 2 8 Flow capacity 1 3 3 9 1 4 Other documents 10 Installation 2 10 2 1 Check properties 10 2 2 Mounting 10 2 3 Fluidic connections 11 Operation 3 11 3 1 First use 11 3 2 Points of attention 12 Maintenance 4 13 Troubleshooting and service 5 13 5 1 Common issues 13 5 2 Service 14 Removal and return instructions 6 ...

Page 6: ...CO Carbon monoxide Ar Argon CO2 Carbon dioxide CH4 Methane C3H8 Propane N2O Nitrous oxide C4H10 Butane H2O water For other media alwayscheckcompatibilitywiththewettedparts beforedeployingtheinstrument seeWetted materials FLOW CONTROLinstrumentsarenot suitablefor usewithHe Helium andH Hydrogen Theenduser isconsideredtobefamiliar withthenecessarysafetyprecautions andtocomplywiththeappropriate protec...

Page 7: ...e equally unstable The FLOW CONTROL eliminates this effect by keeping the pressure drop across the needle valve DP constant with the aid of a membrane operated normally open valve The membrane is actuated by a mechanical spring which forces the valve to open Pressurizing the inlet adds pressure to the volume under the membrane until it is lifted causing the pressure compensation valve to close At ...

Page 8: ...le below lists the flow capacities for compatible media Ranges are in ln min SLM measured at 0 C and 1 013 bar a except where otherwise stated Media FC 001 FC 002 FC 004 FC 005 Air 0 02 0 6 0 02 7 0 02 25 0 02 50 N2 0 02 0 6 0 02 7 0 02 25 0 02 50 O2 0 02 0 55 0 02 6 5 0 02 23 0 02 47 CO 0 02 0 6 0 02 7 0 02 25 0 02 50 Ar 0 04 0 5 0 04 5 5 0 04 21 0 04 42 CO2 0 02 0 45 0 02 5 5 0 02 20 0 02 40 CH4...

Page 9: ...This document contains all necessary information for basic operation and maintenance A material certificate will be provided on request A dimensional drawingcanbedownloadedfrom www massflow online com service_support downloads Dimensional drawingMASS VIEW FC 00x document no 7 05 924 ...

Page 10: ...sbehigher thanthemaximum operatingpressure Disassemblingtheinstrument will invalidatethepressuretest specification 2 2 Mounting The FLOW CONTROL has no preferred mounting position or orientation 2 3 Fluidic connections Wheninstallingfittings donot applyexcessiveforce asthismaycausedamagetothethreadsor other sensitivepartsofthe instrument Tightenthenut finger tight whileholdingtheinstrument thentig...

Page 11: ...trument toair 3 2 Points of attention Checkthesystem for leaksbeforeapplyingpressure especiallyiftoxic explosiveor other dangerousfluidsareused Besuretoapplythespecifiedoperatingpressure s Avoidpressureshocksandbringthefluidic system graduallyuptothe level of operatingconditions openandclosethefluidsupplygently Donot pressurizetheinstrument beyondthemaximum workingpressure statedontheinstrument la...

Page 12: ... cleaning the inside of the device may be required Inexpertlyservicinginstrumentscanleadtoseriouspersonal injuryand or damagetotheinstrument or thesystem it is usedin Therefore servicingmust beperformedbytrainedandqualifiedpersonnel Contact MassFlowONLINE for informationabout cleaningandcalibration MassFlowONLINE hasatrainedstaffavailable TheFLOW CONTROLissealedafter final adjustment at thefactory...

Page 13: ...n but contact MassFlowONLINE for serviceor repairs 5 1 Common issues Symptom Possiblecause Action Flow present while valve is closed Valve leaking Contact Mass Flow ONLINE No flow opening the needle valve has no effect No fluid supply Check upstream components for obstruction e g fluidic lines valves filters Process outlet blocked Check process outlet and downstream piping for obstruction Valve ma...

Page 14: ...ent temperature before packaging 6 Insert the instrument into a plastic bag and seal the bag 7 Place the bag in an appropriate shipping container if possible use the original packaging box Add documentation Reason of return Failure symptoms Contaminated condition Declaration on decontamination It is absolutely required to notify the factory if toxicordangerous fluids have been in contact with the ...

Reviews: