Brodie AB295 Installation And Operation Manual Download Page 1

1

Installation and Operation Manual

Model Non-Ferrous BiRotor Plus

Engineering the Future

TM

BI-NFBRPLUS 

Revision 03 

Feb 2017

Summary of Contents for AB295

Page 1: ...1 Installation and Operation Manual Model Non Ferrous BiRotor Plus Engineering the Future TM BI NFBRPLUS Revision 03 Feb 2017...

Page 2: ......

Page 3: ...nt 1 3 0 Return Shipment 1 4 0 Storage 2 5 0 Introduction 2 6 0 Specifications 3 7 0 Installation 6 8 0 Maintenance 9 9 0 Troubleshooting 12 10 0 Parts List 14 11 0 Model Code 16 12 0 Warranty Claim P...

Page 4: ...is publication are presented for informational purposes only and while every effort has been made to ensure their accuracy they are not to be construed as warranties or guarantees expressed or implied...

Page 5: ...uction manual or marked on the instruments name plates Install the equipment as specified in the installation instructions of the appropriate manual and in accordance to local and national codes To en...

Page 6: ...ulations These components may include pumps air eliminators strainers valves flow computers etc The unit must be sealed in accordance with the local regulations it is the end users responsibility to e...

Page 7: ...mical reactions It is the end users responsibility to provide fire protection measures and equipment in accordance with the local regulations It is the end users responsibility to install suitable str...

Page 8: ...mosphere all the electrical circuits must be interrupted If replacement of the screws which secure the sensor housing the UMB cover of the electronic register and its cover are required they must be r...

Page 9: ...ing as the safety of the enclosure may be impaired It is the end users responsibility to inspect these surfaces every time the enclosure is opened When flanged flame paths are re assembled the gap bet...

Page 10: ...ination form is included in section 13 of this manual Note When an instrument is being removed from service is must be thoroughly drained and any hazardous substances neutralised Care must be taken to...

Page 11: ...m into known volumetric segments isolating those segments momentarily and then returning them to the flowing stream while counting the number of displacements This is a direct volume measurement there...

Page 12: ...able Square wave 0 to 5 KHz 5 V Powered Pulse 0 5 VDC 20 mA Max Variable Voltage Pulses 0 to Supply Voltage Less 5 70 mA max Open Collector Max voltage 30 VDC Max current 125 mA Max power 0 5 W Perfor...

Page 13: ...Table 3 Flow Ranges Rates are in Extended Flow Ranges To convert pressure drop value to the actual process fluid use the following equation PA cPA 0 25 X SGA 0 75 X Pm PA Pressure Drop on Actual Flui...

Page 14: ...Plus Dimensions Tolerance 1 8 3mm Model Size Unit A B C D E F G H J AB295 4 Victaulic inch 26 1 2 6 5 8 15 7 8 13 1 4 6 5 8 6 1 4 1 3 8 6 11 16 13 1 8 mm 173 168 403 337 168 159 35 170 333 AB296 6 Vi...

Page 15: ...ids etc Either of these factors could induce a signal into the flow sensing pick off and interfere with the measurement Installing the Instrument Remove the inlet and outlet protection covers Install...

Page 16: ...the down stream isolation valve and check for any leaks If any leaks are found check seals and retighten connections To pressurize the system fully open the upstream isolation valve Flow Start Up Onc...

Page 17: ...al friction The instrument should always be kept free of water keeping it full of the process fluid will accomplish this but if this is not possible a regular inspection program should be set up and a...

Page 18: ...heath 1000 Ohms 15 For Sensor with ident marker on sensor 750 Ohms 15 Resistance between leads and housing when installed 10 M Ohms If any of this is not the case the pick off should be replaced To re...

Page 19: ...timing gears 6 and 49 2 Fold down the lock washer 5 tabs to enable the nuts 4 to be undone then remove them and the lock washers from the rotor shafts The timing gears 6 and 49 can be released from th...

Page 20: ...9 and nuts 4 to the rotor shafts tighten these only finger tight until the clearances have been correctly set Refer to the setting clearance section 9 Replace the pulse wheel 14 on the right hand roto...

Page 21: ...e proper wiring connections have been made 3 Supply sufficient voltage to the preamplifier board see specifications in Section 6 4 Ensure power is connected to the device and all it associated ancilla...

Page 22: ...13 This page left blank intentionally...

Page 23: ...14 10 0 Parts List Figure 8 Exploded View of Non Ferrous BiRotor Plus Model AB29X...

Page 24: ...00 201 00 2 30 Spring 1500418 2 31 Hold Down Washer 86030 001 1 33 Gasket CA 375Z 259 XXA 1 34 Circuit Board 230 00 300 00 1 35 UMB Cover 899 00 101 00 1 37 Wiring Instructions 899 00 228 07 1 38 Nut...

Page 25: ...16 11 0 Model Code...

Page 26: ...be obligated to pay any costs or charges incurred by Buyer or any other party except as may be agreed upon in writing in advance by an authorized Brodie representative All costs of dismantling reinst...

Page 27: ...en used with the item being returned Information Required Product 1 Product 2 Chemical Name Health and Safety Hazards Precautions First Aid I hereby certify the equipment being returned has been clean...

Page 28: ...19 This page left blank intentionally...

Page 29: ...20 Notes...

Page 30: ...21 Notes...

Page 31: ......

Page 32: ...implied regarding the products or services described herein or their use or applicability Brodie Meter Co LLC reserves the right to modify or improve the designs or specifications of such products at...

Reviews: