background image

- 5 -

HOOD

24” TO 30” ABOVE

COOKING SURFACE

8” ROUND

DUCT

INSTALL THE DUCTWORK

NOTE: To reduce the risk of fire, use only metal ductwork.

1. Choose the location where the Exterior or In-Line Blower will be mounted. See

illustrations below for mounting location suggestions and restrictions.

2. A straight, short duct run will allow the hood to perform most efficiently.
3. Long duct runs, elbows and transitions will reduce the performance of the

hood. Use as few of them as possible. Larger ducting may be required for best
performance with long duct runs.

4. After the Exterior or In-Line Blower has been installed, connect round metal

ductwork and work back towards the hood location. Use duct tape to seal joints
between ductwork sections.

5. An 8” round to 10” round transition (Model 414) is required. For best air

performance, install the transition as close to the range hood as possible.

OK

OK

SUGGESTED MOUNTING LOCATIONS

EXTERIOR BLOWER

CAUTION: MAY NOT FIT

UNDER EAVES OF SINGLE

STORY HOMES

EXTERIOR

BLOWER

8” TO 10”

ROUND

TRANSITION

EXTERIOR

BLOWER

10” ROUND

DUCT

8” ROUND

ELBOW

10”

ROUND

DUCT

IN-LINE BLOWER

Summary of Contents for Elite RMPE Series

Page 1: ...RAN AIS 11 ESPA OL 20 Broan NuTone LLC 926 West State Street Hartford WI 53027 NuTone Inc 4820 Red Bank Road Cincinnati OH 45227 Broan NuTone Canada Inc 1140 Tristar Drive Mississauga Ontario L5T 1H9...

Page 2: ...ways be vented to the outdoors 7 Do not use this unit with any separate solid state speed control device 8 To reduce the risk of fire use only metal ductwork 9 This unit must be grounded TO REDUCE THE...

Page 3: ...he motor continues to shut off and restart have the hood serviced 7 For best capture of cooking impurities the bottom of the hood should be a minimum of 24 and a maximum of 30 above the cooking surfac...

Page 4: ...IOR OR IN LINE BLOWER SELECTION CAUTION Either an exterior blower or in line blower may be used with this hood The RMPE hood must be installed with blower models 331H 332H 335 336 HLB3 HLB6 HLB9 or HL...

Page 5: ...few of them as possible Larger ducting may be required for best performance with long duct runs 4 After the Exterior or In Line Blower has been installed connect round metal ductwork and work back tow...

Page 6: ...kness of the panel to which it is going to be anchored 5 Insert the hood in the cabinet and lock it by means of the side spring 6 Use the holes in the casing of the hood to attach it using 4 mounting...

Page 7: ...are not pinched between the cover and box Exterior or In Line blower connection 1 Make electrical connections at the exterior orIn Lineblower seeinstructionsprovided with the exterior or In Line blowe...

Page 8: ...se a non scratching household cleanser or stainless steel polishing powder with a little water and a soft cloth For stubborn cases use a plastic scouring pad or soft bristle brush together with cleans...

Page 9: ...that will turn on or speed up the blower if it senses excessive heat above the cooking surface 1 If blower is OFF it turns blower ON to HIGH speed 2 If blower is ON at a lower speed setting it turns...

Page 10: ...BROAN NUTONE LLC SHALL NOT BE LIABLE FOR INCIDENTAL CONSEQUENTIAL OR SPECIAL DAMAGES ARISING OUT OF OR IN CONNEC TION WITH PRODUCT USE OR PERFORMANCE Some states do not allow the exclusion or limitati...

Page 11: ...TION BOX COVER 144 B03292287 WIRE CLAMP 152 B03292200 WIRE CLAMP 165 B03294781 WIRING BOX 165 B03295008 WIRING BOX 165 B03294780 CONTROLS BOX 166 B08086141 WIRING BOARD 166 B08086668 WIRING BOARD 195...

Page 12: ...SERVICE PARTS LISTE PIECES DE RECHANGE LISTA DE PIEZAS DE RECAMBIO MODEL RMPE 04307767...

Reviews: