5
4. APPLICATION
4.2 Chimneys
The average flue gas temperature is so low that the chim-
ney must be in accordance with the guidelines of British
Gas and BS 6644.
4.3 Installation standards
The following instructions must be adhered to when the
remeha Gas 3c is installed:
Gas safety (installation and use) Regulations 1984 (as
amended).
All gas appliances must, by law, be installed by compe-
tent persons (e.g. Corgi) in accordance with the above
regulations. Failure to install appliances correctly could
lead to prosecution.
It is in your own interest and that of safety to ensure that
the law is complied with.
In addition to the above regulations, this appliance must
be installed in compliance with the current I.E.E.
Regulations for electrical installation, local building regula-
tions, the Building Standards (Scotland), Consolidation
Regulations and bye laws of the local water undertaking
and Health and Safety Document No. 635 'The Electricity
at Work Regulations 1989'. It should also be in accor-
dance with the relevant recommendations in the current
editions of the following British Standards and Codes of
Practice, viz.
BS 5540 Pt 1 and 2, BS 5449, BS 5546, BS 6798,
BS 6891 and BG.DM2.
Important:
The remeha Gas 3c is certified appliance and must not
be modified or installed in any way contrary to these
'Installation and Servicing Instructions'.
Manufacturers instructions must NOT be taken in any way
as overriding statutory obligations.
93
= ... m
3
/h
This minimum flow must be maintained for 5 minutes af-
ter the burner stops firing to avoid high temperature shut-
down due to residuel heat gain.
Due to the design and manufacture of the boiler no speci-
fic minimum water flow requirement exists other than for
high-temperature protection.
4.1.4 Water treatment
Water treatment under normal circumstances is not
necessary (see our water quality recommendations).
4.1.5 Noise level
The noise level measured around the boiler depending
on boiler room construction is about 50-55 dBA.
(Noise level taken at 1 meter from the boiler)
Output boiler in kW
4.1 L.P.H.W. system
4.1.1 Water temperature
Maximum water temperature is 110
°
C (high limit
thermostat).
Highest boiler water temperature is 95
°
C (control
thermostat).
Minimum return water temperature is 20
°
C at a flow rate
related at a
∆
t of 20
°
C (flow/return temperature).
4.1.2 Water pressure
Boiler sections pressure test at 12 bar.
Maximum pressure test for the boiler block is 6 bar.
Minimum working pressure boiler is 0.8 bar.
Maximum working pressure is 6 bar.
4.1.3 Water flow
The minimum water flow through the boiler is:
Summary of Contents for SEAGOLD 1A HR
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ...Atmospheric gas boiler 92 372 kW remeha Gas 3c Technical information ...
Page 98: ...1 remeha Gas 3c ECO Fully condensing atmospheric gas boiler 101 407 kW Technical information ...
Page 124: ...11 9 5 2 Complete instrument panel Fig 09 Wiring diagram for the complete instrument panel ...
Page 130: ...Remeha Gas 350 Atmospheric gas boiler 64 174 kW Technical information R e m e h a G a s 3 5 0 ...
Page 154: ...9 9 5 Wiring diagram boiler Fig 06 Wiring diagram ...
Page 172: ...15 9 7 Wiring diagrams Fig 08 Electrical principle diagram 04 05F SC 00001 ...
Page 178: ......
Page 179: ......
Page 180: ......
Page 181: ......
Page 182: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 186: ......
Page 187: ......
Page 188: ......
Page 189: ......
Page 190: ......
Page 191: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 195: ......
Page 196: ......
Page 197: ......
Page 198: ......
Page 199: ......
Page 200: ......
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ...1 Atmospheric gasboiler 276 1044 kW remeha Gas 5a 5a Duo Technical information ...
Page 227: ...12 remeha Gas 5a 5a Duo 8 4 Wiring diagram Fig 05 Wiring diagram ...
Page 248: ......
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ......
Page 253: ......
Page 254: ......
Page 255: ......
Page 256: ......
Page 257: ......
Page 258: ......
Page 259: ......