
X7-4-Install-IG100 Installation Guide
Brocade
®
X7-4 Director Hardware Installation Guide
Table 10: Torque Requirements for Mounting Screws
Screw Size
Torque
6-32 x .25 in. (.635 cm) Phillips screw
10 cm-kg (8.75 in.-lb)
10-32 x .63 in. (1.60 cm) Phillips screw
36.86 cm-kg (32 in.-lb)
Assembling the Rack Hardware
1. Determine how the device can be oriented in the rack so that the nonport side has access to intake air (cool).
2. Install clip nuts or retainer nuts (as shown in the previous figure) in rack rail locations shown in the following figure.
These nuts will secure the 10-32 screws that mount the Port Side Exhaust Kit shelf and device to the rack. For rails
with round holes, use clip nuts. For rails with square holes, use retainer nuts. Note that the following figure shows
relative positions for these nuts in the rack rails to mount the shelf and device. You may mount the shelf and device in
9U of rack space higher or lower in the rack than shown.
Figure 11: Clip and Retainer Nut Locations on Rack Rails
1. Attaching Clip Nuts for Round Hole Rails
2. Clip or Retainer Nut Locations for Device
3. Clip or Retainer Nut Locations for Shelf
4. Retainer Nut for Rails with Square Holes
5. Rail
X7-4-Install-IG100
39
Broadcom
Summary of Contents for Brocade X7-4 Director
Page 215: ......