G730-Install-IG100 Installation Guide
Brocade
®
G730 Switch Hardware Installation Guide
Installing the Device in the Rack
Perform the following steps to install the device in the rack:
1. Position the device in the rack, providing temporary support under the device until the rail kit is secured to the rack.
2. Attach the right front bracket to the right rear rack post using two 10-32 x 5/8-in. panhead screws and two retainer
nuts. Use the upper and lower holes in the bracket.
3. Tighten all 10-32 x 5/8-in. screws to a torque of 29 cm-kg (25 in.-lb).
Figure 13: Positioning the Device in the Rack
1. Screws, 10-32 x 5/8-in. Panhead Phillips
2. Retainer Nuts, 10-32
Attaching the Rear Brackets to the Extensions at the Front of the Device
Perform the following steps to attach the rear brackets to the extensions. The rack depth determines the use of short or
long brackets.
1. Select the proper length rear bracket for your rack depth.
2. Slide the right rear bracket onto the right extension.
The short rear brackets are shown in the first figure. Use the first and third vertical pairs of holes for the screws.
See the second figure for the positioning of the short or long brackets and screws.
G730-Install-IG100
30
Summary of Contents for Brocade G730
Page 94: ......